Step4RunningRequirements » History » Revision 28
Revision 27 (Dobbs, Adam, 07 May 2014 13:49) → Revision 28/48 (Dobbs, Adam, 07 May 2014 13:55)
h1. Step 4 Running Requirements {{toc}} h2. Personnel | | *Task* | *Sub Task* | *Owner* | *Notes* | | Pool of MOMs | | Boyd | | | Pool of BLOCs | | Nebrensky | ~5 trained at present | | Pool of SOCs | | Rajaram | | | Pool of shifters | | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] | | Shift allocation scheme and recording system | | Blondel | | | Detector experts | | Soler | | | h2. Beamline Overall responsibility for beamline rests with Pasternak / Nebrensky. | | *Task* | *Sub Task* | *Owner* | *Notes* | | Target || Hodgson | | Decay Solenoid | | | | | Proton Absorbers | | | | | Conventional Magnets | | Hughes | | | Beam Stop | | Govans | | | h2. Cooling Channel | | *Task* | *Sub Task* | *Owner* | *Notes* | | Spectrometer Solenoids | | | | | Hydrogen delivery system | | Watson | | | FC1 | | Cobb | | | LH2 Absorber | | | | | LiH Absorber | | | | | Quench Protection and Monitoring | | | | | h2. Detectors | | *Task* | *Sub Task* | *Owner* | *Notes* | | CKOVs | | Cremaldi | | | TOFs | | Bonesini | | | Tracker | | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 | | KL | | Bogolimov | | | EMR | | Blondel | | | h2. Hall and Infrastructure | | *Task* | *Sub Task* | *Owner* | *Notes* | | Hall Services | | | | | | Neutron Monitor | | | | | Oxygen depletion alarm | | | | | PPS | | | | | Clean (what standard?) | | | | | Surveys | | | | PRY | | | | | Cooler Compressors | | | | | Vacuum System | | | | | Power Systems | | | | | h2. DAQ | | *Task* | *Sub Task* | *Owner* | *Notes* | | * DATE | | | | | * Run Control Interface | | | | | * Digitisation boards (-> FPGA system) | | | | | h2. Online Computing | | *Task* | *Sub Task* | *Owner* | *Notes* | | * Online Monitoring | | | | | * Online Reconstruction | | | | | * Data storage and movement | | | | | | * UPS | | | | | * RAID systems | | | | | * Data mover | | | | * Controls and Monitoring | | | | | | * Run Control | | | | | * Alarm handler | | | | | * Environment readout | | | | | * Webcams | | | | | * DS | | | | | * Target | | | | | * Proton absorber | | | | h2. Offline Computing * Full reconstruction chain with all detectors * Global fits * Data quality checks * Automated grid batch processing