« Previous |
Revision 27/48
(diff)
| Next »
Dobbs, Adam, 07 May 2014 13:49
Step 4 Running Requirements¶
Personnel¶
Task |
Sub Task |
Owner |
Notes |
Pool of MOMs |
|
Boyd |
|
Pool of BLOCs |
|
Nebrensky |
~5 trained at present |
Pool of SOCs |
|
Rajaram |
|
Pool of shifters |
|
Kyberd? |
24 at current count, 6 qualified as lead shifters, see Training_Shifters |
Shift allocation scheme and recording system |
|
Blondel |
|
Detector experts |
|
Soler |
|
Beamline¶
Overall responsibility for beamline rests with Pasternak / Nebrensky.
Task |
Sub Task |
Owner |
Notes |
Target |
|
Hodgson |
Decay Solenoid |
|
|
|
Proton Absorbers |
|
|
|
Conventional Magnets |
|
Hughes |
|
Beam Stop |
|
Govans |
|
Cooling Channel¶
Task |
Sub Task |
Owner |
Notes |
Spectrometer Solenoids |
|
|
|
Hydrogen delivery system |
|
Watson |
|
FC1 |
|
Cobb |
|
LH2 Absorber |
|
|
|
LiH Absorber |
|
|
|
Quench Protection and Monitoring |
|
|
|
Detectors¶
Task |
Sub Task |
Owner |
Notes |
CKOVs |
|
Cremaldi |
|
TOFs |
|
Bonesini |
|
Tracker |
|
Adey / Dobbs / Uchida |
Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 |
KL |
|
Bogolimov |
|
EMR |
|
Blondel |
|
Hall and Infrastructure¶
Task |
Sub Task |
Owner |
Notes |
Hall Services |
|
|
|
|
Neutron Monitor |
|
|
|
Oxygen depletion alarm |
|
|
|
PPS |
|
|
|
Clean (what standard?) |
|
|
|
Surveys |
|
|
PRY |
|
|
|
Cooler Compressors |
|
|
|
Vacuum System |
|
|
|
Power Systems |
|
|
|
DAQ¶
- DATE
- Run Control Interface
- Digitisation boards (-> FPGA system)
Online Computing¶
- Online Monitoring
- Online Reconstruction
- Data storage and movement
- UPS
- RAID systems
- Data mover
- Controls and Monitoring
- Run Control
- Alarm handler
- Environment readout
- Webcams
- DS
- Target
- Proton absorber
Offline Computing¶
- Full reconstruction chain with all detectors
- Global fits
- Data quality checks
- Automated grid batch processing
Updated by Dobbs, Adam over 9 years ago
· 27 revisions