h1. Step 4 Running Requirements 

 {{toc}}  

 h2. Personnel 

 | 
 | *Task* | *Sub Task* | *Owner* | *Notes* | 
 | Pool of MOMs | | Boyd | | 
 | Pool of BLOCs | | Nebrensky | ~5 trained at present | 
 | Pool of SOCs | | Rajaram | | 
 | Pool of shifters | | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] | 
 | Shift allocation scheme and recording system | | Blondel | | 
 | Detector experts | | Soler | | 
 | 

 h2. Beamline 

 Overall responsibility for beamline rests with Pasternak / Nebrensky. 

 | 
 | *Task* | *Sub Task* | *Owner* | *Notes* | 
 | Target ||    Hodgson | 
 | Decay Solenoid | | | | 
 | Proton Absorbers | | | | 
 | Conventional Magnets | | Hughes | | 
 | Beam Stop | | Govans | | 
 | 

 h2. Cooling Channel 

 | 
 | *Task* | *Sub Task* | *Owner* | *Notes* | 
 | Spectrometer Solenoids | | | | 
 | Hydrogen delivery system | | Watson | | 
 | FC1 | | Cobb | | 
 | LH2 Absorber | | | | 
 | LiH Absorber    | | | | 
 | Quench Protection and Monitoring | | | | 
 | 

 h2. Detectors 

 | 
 | *Task* | *Sub Task* | *Owner* | *Notes* | 
 | CKOVs | | Cremaldi | | 
 | TOFs | | Bonesini | | 
 | Tracker | | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 | 
 | KL | | Bogolimov | | 
 | EMR | | Blondel | | 
 | 

 h2. Hall and Infrastructure 

 | 
 | *Task* | *Sub Task* | *Owner* | *Notes* | 
 | * Hall Services | | | | 
 | | 

    * Neutron Monitor | | | 
 | | 
    * Oxygen depletion alarm | | | 
 | | 
    * PPS | | | 
 | | 
    * Clean (what standard?) | | | 
 | | 
    * Surveys | | | 
 * PRY 
 * Cooler Compressors 
 * Vacuum System 
 * Power Systems  

 h2. DAQ 

 * DATE 
 * Run Control Interface 
 * Digitisation boards (-> FPGA system) 

 h2. Online Computing 

 * Online Monitoring 
 * Online Reconstruction 
 * Data storage and movement 

     * UPS 
     * RAID systems 
     * Data mover 
 *    Controls and Monitoring 

     * Run Control 
     * Alarm handler 
     * Environment readout 
     * Webcams 
     * DS 
     * Target 
     * Proton absorber 


 h2. Offline Computing 

 * Full reconstruction chain with all detectors 
 * Global fits 
 * Data quality checks 
 * Automated grid batch processing