h1. Step 4 Running Requirements
2 1 Dobbs, Adam
3 23 Dobbs, Adam
{{toc}} 
4
5 1 Dobbs, Adam
h2. Personnel
6
7 15 Dobbs, Adam
|
8 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
9 24 Dobbs, Adam
| Pool of MOMs | | Boyd | |
10
| Pool of BLOCs | | Nebrensky | ~5 trained at present |
11
| Pool of SOCs | | Rajaram | |
12
| Pool of shifters | | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] |
13
| Shift allocation scheme and recording system | | Blondel | |
14
| Detector experts | | Soler | |
15 15 Dobbs, Adam
|
16 1 Dobbs, Adam
17
h2. Beamline
18
19 19 Dobbs, Adam
Overall responsibility for beamline rests with Pasternak / Nebrensky.
20
21 16 Dobbs, Adam
|
22 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
23 22 Dobbs, Adam
| Target ||  Hodgson |
24
| Decay Solenoid | | | |
25
| Proton Absorbers | | | |
26
| Conventional Magnets | | Hughes | |
27
| Beam Stop | | Govans | |
28 16 Dobbs, Adam
|
29 1 Dobbs, Adam
30 6 Gamet, Raymond
h2. Cooling Channel
31 1 Dobbs, Adam
32 18 Dobbs, Adam
|
33 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
34
| Spectrometer Solenoids | | | |
35
| Hydrogen delivery system | | Watson | |
36
| FC1 | | Cobb | |
37
| LH2 Absorber | | | |
38
| LiH Absorber  | | | |
39
| Quench Protection and Monitoring | | | |
40 18 Dobbs, Adam
|
41 7 Gamet, Raymond
42
h2. Detectors
43 6 Gamet, Raymond
44 18 Dobbs, Adam
|
45 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
46
| CKOVs | | Cremaldi | |
47
| TOFs | | Bonesini | |
48
| Tracker | | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 |
49
| KL | | Bogolimov | |
50
| EMR | | Blondel | |
51 18 Dobbs, Adam
|
52 1 Dobbs, Adam
53 6 Gamet, Raymond
h2. Hall and Infrastructure
54 1 Dobbs, Adam
55 25 Dobbs, Adam
|
56
| *Task* | *Sub Task* | *Owner* | *Notes* |
57
| Hall Services | | | |
58
| | Neutron Monitor | | |
59
| | Oxygen depletion alarm | | |
60
| | PPS | | |
61
| | Clean (what standard?) | | |
62
| | Surveys | | |
63 1 Dobbs, Adam
* PRY
64 6 Gamet, Raymond
* Cooler Compressors
65
* Vacuum System
66
* Power Systems 
67 5 Dobbs, Adam
68
h2. DAQ
69 1 Dobbs, Adam
70
* DATE
71
* Run Control Interface
72
* Digitisation boards (-> FPGA system)
73
74
h2. Online Computing
75
76 6 Gamet, Raymond
* Online Monitoring
77
* Online Reconstruction
78 1 Dobbs, Adam
* Data storage and movement
79 9 Gamet, Raymond
80
    * UPS
81 6 Gamet, Raymond
    * RAID systems
82
    * Data mover
83
*  Controls and Monitoring
84 10 Gamet, Raymond
85 6 Gamet, Raymond
    * Run Control
86
    * Alarm handler
87
    * Environment readout
88
    * Webcams
89
    * DS
90
    * Target
91
    * Proton absorber
92 1 Dobbs, Adam
93
94
h2. Offline Computing
95
96
* Full reconstruction chain with all detectors
97
* Global fits
98
* Data quality checks
99
* Automated grid batch processing