Project

General

Profile

Step4RunningRequirements » History » Version 24

Dobbs, Adam, 07 May 2014 13:46

1 2 Dobbs, Adam
h1. Step 4 Running Requirements
2 1 Dobbs, Adam
3 23 Dobbs, Adam
{{toc}} 
4
5 1 Dobbs, Adam
h2. Personnel
6
7 15 Dobbs, Adam
|
8 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
9 24 Dobbs, Adam
| Pool of MOMs | | Boyd | |
10
| Pool of BLOCs | | Nebrensky | ~5 trained at present |
11
| Pool of SOCs | | Rajaram | |
12
| Pool of shifters | | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] |
13
| Shift allocation scheme and recording system | | Blondel | |
14
| Detector experts | | Soler | |
15 15 Dobbs, Adam
|
16 1 Dobbs, Adam
17
h2. Beamline
18
19 19 Dobbs, Adam
Overall responsibility for beamline rests with Pasternak / Nebrensky.
20
21 16 Dobbs, Adam
|
22 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
23 22 Dobbs, Adam
| Target ||  Hodgson |
24
| Decay Solenoid | | | |
25
| Proton Absorbers | | | |
26
| Conventional Magnets | | Hughes | |
27
| Beam Stop | | Govans | |
28 16 Dobbs, Adam
|
29 1 Dobbs, Adam
30 6 Gamet, Raymond
h2. Cooling Channel
31 1 Dobbs, Adam
32 18 Dobbs, Adam
|
33 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
34
| Spectrometer Solenoids | | | |
35
| Hydrogen delivery system | | Watson | |
36
| FC1 | | Cobb | |
37
| LH2 Absorber | | | |
38
| LiH Absorber  | | | |
39
| Quench Protection and Monitoring | | | |
40 18 Dobbs, Adam
|
41 7 Gamet, Raymond
42
h2. Detectors
43 6 Gamet, Raymond
44 18 Dobbs, Adam
|
45 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
46
| CKOVs | | Cremaldi | |
47
| TOFs | | Bonesini | |
48
| Tracker | | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 |
49
| KL | | Bogolimov | |
50
| EMR | | Blondel | |
51 18 Dobbs, Adam
|
52 1 Dobbs, Adam
53 6 Gamet, Raymond
h2. Hall and Infrastructure
54 1 Dobbs, Adam
55 6 Gamet, Raymond
* Hall Services
56 9 Gamet, Raymond
57 6 Gamet, Raymond
   * Neutron Monitor
58
   * Oxygen depletion alarm
59
   * PPS
60
   * Clean (what standard?)
61
   * Surveys
62 1 Dobbs, Adam
* PRY
63 6 Gamet, Raymond
* Cooler Compressors
64
* Vacuum System
65
* Power Systems 
66 5 Dobbs, Adam
67
h2. DAQ
68 1 Dobbs, Adam
69
* DATE
70
* Run Control Interface
71
* Digitisation boards (-> FPGA system)
72
73
h2. Online Computing
74
75 6 Gamet, Raymond
* Online Monitoring
76
* Online Reconstruction
77 1 Dobbs, Adam
* Data storage and movement
78 9 Gamet, Raymond
79
    * UPS
80 6 Gamet, Raymond
    * RAID systems
81
    * Data mover
82
*  Controls and Monitoring
83 10 Gamet, Raymond
84 6 Gamet, Raymond
    * Run Control
85
    * Alarm handler
86
    * Environment readout
87
    * Webcams
88
    * DS
89
    * Target
90
    * Proton absorber
91 1 Dobbs, Adam
92
93
h2. Offline Computing
94
95
* Full reconstruction chain with all detectors
96
* Global fits
97
* Data quality checks
98
* Automated grid batch processing