Actions
Step4RunningRequirements » History » Revision 22
« Previous |
Revision 22/48
(diff)
| Next »
Dobbs, Adam, 07 May 2014 13:41
Step 4 Running Requirements¶
Personnel¶
Task | Sub Task | Owner | Notes |
Pool of MOMs | Boyd | ||
Pool of BLOCs | Nebrensky | ~5 trained at present | |
Pool of SOCs | Rajaram | ||
Pool of shifters | Kyberd? | 24 at current count, 6 qualified as lead shifters, see Training_Shifters | |
Shift allocation scheme and recording system | Blondel | ||
Detector experts | Soler | ||
Beamline¶
Overall responsibility for beamline rests with Pasternak / Nebrensky.
Task | Sub Task | Owner | Notes |
Target | Hodgson | ||
Decay Solenoid | |||
Proton Absorbers | |||
Conventional Magnets | Hughes | ||
Beam Stop | Govans | ||
Cooling Channel¶
Task | Sub Task | Owner | Notes |
Spectrometer Solenoids | |||
Hydrogen delivery system | Watson | ||
FC1 | Cobb | ||
LH2 Absorber | |||
LiH Absorber | |||
Quench Protection and Monitoring | |||
Detectors¶
Task | Sub Task | Owner | Notes |
CKOVs | Cremaldi | ||
TOFs | Bonesini | ||
Tracker | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 | |
KL | Bogolimov | ||
EMR | Blondel | ||
Hall and Infrastructure¶
- Hall Services
- Neutron Monitor
- Oxygen depletion alarm
- PPS
- Clean (what standard?)
- Surveys
- PRY
- Cooler Compressors
- Vacuum System
- Power Systems
DAQ¶
- DATE
- Run Control Interface
- Digitisation boards (-> FPGA system)
Online Computing¶
- Online Monitoring
- Online Reconstruction
- Data storage and movement
- UPS
- RAID systems
- Data mover
- Controls and Monitoring
- Run Control
- Alarm handler
- Environment readout
- Webcams
- DS
- Target
- Proton absorber
Offline Computing¶
- Full reconstruction chain with all detectors
- Global fits
- Data quality checks
- Automated grid batch processing
Updated by Dobbs, Adam about 9 years ago · 22 revisions