Step4RunningRequirements » History » Version 18
Dobbs, Adam, 07 May 2014 13:33
1 | 2 | Dobbs, Adam | h1. Step 4 Running Requirements |
---|---|---|---|
2 | 1 | Dobbs, Adam | |
3 | h2. Personnel |
||
4 | |||
5 | 15 | Dobbs, Adam | | |
6 | | *Task* | *Owner* | *Notes* | |
||
7 | | Pool of MOMs | Boyd | | |
||
8 | | Pool of BLOCs | Nebrensky | ~5 trained at present | |
||
9 | | Pool of SOCs | Rajaram | | |
||
10 | | Pool of shifters | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] | |
||
11 | | Shift allocation scheme and recording system | Blondel | | |
||
12 | | Detector experts | Soler | | |
||
13 | | |
||
14 | 1 | Dobbs, Adam | |
15 | h2. Beamline |
||
16 | |||
17 | 16 | Dobbs, Adam | | |
18 | | *Task* | *Owner* | *Notes* | |
||
19 | 17 | Dobbs, Adam | | Target | Hodgson | | |
20 | 18 | Dobbs, Adam | | Decay Solenoid | | | |
21 | 16 | Dobbs, Adam | | Proton Absorbers | | | |
22 | 17 | Dobbs, Adam | | Conventional Magnets | Hughes | | |
23 | | Beam Stop | Govans | | |
||
24 | 16 | Dobbs, Adam | | |
25 | 1 | Dobbs, Adam | |
26 | 6 | Gamet, Raymond | h2. Cooling Channel |
27 | 1 | Dobbs, Adam | |
28 | 18 | Dobbs, Adam | | |
29 | | *Task* | *Owner* | *Notes* | |
||
30 | | Spectrometer Solenoids | | | |
||
31 | | Hydrogen delivery system | | | |
||
32 | | FC1 | | | |
||
33 | | LH2 Absorber | | | |
||
34 | | LiH Absorber | | | |
||
35 | | Quench Protection and Monitoring | | | |
||
36 | | |
||
37 | 7 | Gamet, Raymond | |
38 | h2. Detectors |
||
39 | 6 | Gamet, Raymond | |
40 | 18 | Dobbs, Adam | | |
41 | | *Task* | *Owner* | *Notes* | |
||
42 | | CKOVs | | | |
||
43 | | TOFs | | | |
||
44 | | Tracker: Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 | | | |
||
45 | | KL | | | |
||
46 | | EMR | | | |
||
47 | | |
||
48 | 1 | Dobbs, Adam | |
49 | 6 | Gamet, Raymond | h2. Hall and Infrastructure |
50 | 1 | Dobbs, Adam | |
51 | 6 | Gamet, Raymond | * Hall Services |
52 | 9 | Gamet, Raymond | |
53 | 6 | Gamet, Raymond | * Neutron Monitor |
54 | * Oxygen depletion alarm |
||
55 | * PPS |
||
56 | * Clean (what standard?) |
||
57 | * Surveys |
||
58 | 1 | Dobbs, Adam | * PRY |
59 | 6 | Gamet, Raymond | * Cooler Compressors |
60 | * Vacuum System |
||
61 | * Power Systems |
||
62 | 5 | Dobbs, Adam | |
63 | h2. DAQ |
||
64 | 1 | Dobbs, Adam | |
65 | * DATE |
||
66 | * Run Control Interface |
||
67 | * Digitisation boards (-> FPGA system) |
||
68 | |||
69 | h2. Online Computing |
||
70 | |||
71 | 6 | Gamet, Raymond | * Online Monitoring |
72 | * Online Reconstruction |
||
73 | 1 | Dobbs, Adam | * Data storage and movement |
74 | 9 | Gamet, Raymond | |
75 | * UPS |
||
76 | 6 | Gamet, Raymond | * RAID systems |
77 | * Data mover |
||
78 | * Controls and Monitoring |
||
79 | 10 | Gamet, Raymond | |
80 | 6 | Gamet, Raymond | * Run Control |
81 | * Alarm handler |
||
82 | * Environment readout |
||
83 | * Webcams |
||
84 | * DS |
||
85 | * Target |
||
86 | * Proton absorber |
||
87 | 1 | Dobbs, Adam | |
88 | |||
89 | h2. Offline Computing |
||
90 | |||
91 | * Full reconstruction chain with all detectors |
||
92 | * Global fits |
||
93 | * Data quality checks |
||
94 | * Automated grid batch processing |