h1. Step 4 Running Requirements 

 h2. Personnel 

 | 
 | *Task* | *Owner* | *Notes* | 
 | Pool of MOMs | Boyd | | 
 | Pool of BLOCs | Nebrensky | ~5 trained at present | 
 | Pool of SOCs | Rajaram | | 
 | Pool of shifters | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] | 
 | Shift allocation scheme and recording system | Blondel | | 
 | Detector experts | Soler | | 
 | 

 h2. Beamline 

 | 
 | *Task* | *Owner* | *Notes* | 
 | * Target | Hodgeson | | 
 | * Decay Solenoid | Bayliss? | | 
 | * Proton Absorbers | | | 
 | * Conventional Magnets | Nebrensky | | 
 | * Beam Stop | Govans? | | 
 | 

 h2. Cooling Channel 

 * Spectrometer Solenoids 
 * Hydrogen delivery system 
 * FC1 
 * LH2 Absorber 
 * LiH Absorber 
 * Quench Protection and Monitoring 

 h2. Detectors 

 * CKOVs 
 * TOFs 
 * Tracker: Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 
 * KL 
 * EMR 

 h2. Hall and Infrastructure 

 * Hall Services 

    * Neutron Monitor 
    * Oxygen depletion alarm 
    * PPS 
    * Clean (what standard?) 
    * Surveys 
 * PRY 
 * Cooler Compressors 
 * Vacuum System 
 * Power Systems  

 h2. DAQ 

 * DATE 
 * Run Control Interface 
 * Digitisation boards (-> FPGA system) 

 h2. Online Computing 

 * Online Monitoring 
 * Online Reconstruction 
 * Data storage and movement 

     * UPS 
     * RAID systems 
     * Data mover 
 *    Controls and Monitoring 

     * Run Control 
     * Alarm handler 
     * Environment readout 
     * Webcams 
     * DS 
     * Target 
     * Proton absorber 


 h2. Offline Computing 

 * Full reconstruction chain with all detectors 
 * Global fits 
 * Data quality checks 
 * Automated grid batch processing