Step 4 Running Requirements¶
Personnel¶
Task | Owner | Notes |
Pool of MOMs | Boyd | |
Pool of BLOCs | Nebrensky | ~5 trained at present |
Pool of SOCs | Rajaram | |
Pool of shifters | Kyberd? | 24 at current count, 6 qualified as lead shifters, see Training_Shifters |
Shift allocation scheme and recording system | Blondel | |
Detector experts | Soler | |
Beamline¶
Task | Owner | Notes |
Target | Hodgeson | |
Decay Solenoid | Bayliss? | |
Proton Absorbers | ||
Conventional Magnets | Nebrensky | |
Beam Stop | Govans? | |
Cooling Channel¶
- Spectrometer Solenoids
- Hydrogen delivery system
- FC1
- LH2 Absorber
- LiH Absorber
- Quench Protection and Monitoring
Detectors¶
- CKOVs
- TOFs
- Tracker: Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85
- KL
- EMR
Hall and Infrastructure¶
- Hall Services
- Neutron Monitor
- Oxygen depletion alarm
- PPS
- Clean (what standard?)
- Surveys
- PRY
- Cooler Compressors
- Vacuum System
- Power Systems
DAQ¶
- DATE
- Run Control Interface
- Digitisation boards (-> FPGA system)
Online Computing¶
- Online Monitoring
- Online Reconstruction
- Data storage and movement
- UPS
- RAID systems
- Data mover
- Controls and Monitoring
- Run Control
- Alarm handler
- Environment readout
- Webcams
- DS
- Target
- Proton absorber
Offline Computing¶
- Full reconstruction chain with all detectors
- Global fits
- Data quality checks
- Automated grid batch processing