Step4RunningRequirements » History » Version 15
Dobbs, Adam, 07 May 2014 12:38
1 | 2 | Dobbs, Adam | h1. Step 4 Running Requirements |
---|---|---|---|
2 | 1 | Dobbs, Adam | |
3 | h2. Personnel |
||
4 | |||
5 | 15 | Dobbs, Adam | | |
6 | | *Task* | *Owner* | *Notes* | |
||
7 | | Pool of MOMs | Boyd | | |
||
8 | | Pool of BLOCs | Nebrensky | ~5 trained at present | |
||
9 | | Pool of SOCs | Rajaram | | |
||
10 | | Pool of shifters | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] | |
||
11 | | Shift allocation scheme and recording system | Blondel | | |
||
12 | | Detector experts | Soler | | |
||
13 | | |
||
14 | 1 | Dobbs, Adam | |
15 | h2. Beamline |
||
16 | |||
17 | 6 | Gamet, Raymond | * Target |
18 | * Decay Solenoid |
||
19 | * Proton Absorbers |
||
20 | * Conventional Magnets |
||
21 | * Beam Stop |
||
22 | 1 | Dobbs, Adam | |
23 | 6 | Gamet, Raymond | h2. Cooling Channel |
24 | |||
25 | * Spectrometer Solenoids |
||
26 | 1 | Dobbs, Adam | * Hydrogen delivery system |
27 | * FC1 |
||
28 | 7 | Gamet, Raymond | * LH2 Absorber |
29 | * LiH Absorber |
||
30 | 6 | Gamet, Raymond | * Quench Protection and Monitoring |
31 | 2 | Dobbs, Adam | |
32 | 1 | Dobbs, Adam | h2. Detectors |
33 | |||
34 | 6 | Gamet, Raymond | * CKOVs |
35 | * TOFs |
||
36 | 14 | Dobbs, Adam | * Tracker: Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 |
37 | 6 | Gamet, Raymond | * KL |
38 | * EMR |
||
39 | 1 | Dobbs, Adam | |
40 | 6 | Gamet, Raymond | h2. Hall and Infrastructure |
41 | 1 | Dobbs, Adam | |
42 | 6 | Gamet, Raymond | * Hall Services |
43 | 9 | Gamet, Raymond | |
44 | 6 | Gamet, Raymond | * Neutron Monitor |
45 | * Oxygen depletion alarm |
||
46 | * PPS |
||
47 | * Clean (what standard?) |
||
48 | * Surveys |
||
49 | 1 | Dobbs, Adam | * PRY |
50 | 6 | Gamet, Raymond | * Cooler Compressors |
51 | * Vacuum System |
||
52 | * Power Systems |
||
53 | 5 | Dobbs, Adam | |
54 | h2. DAQ |
||
55 | 1 | Dobbs, Adam | |
56 | * DATE |
||
57 | * Run Control Interface |
||
58 | * Digitisation boards (-> FPGA system) |
||
59 | |||
60 | h2. Online Computing |
||
61 | |||
62 | 6 | Gamet, Raymond | * Online Monitoring |
63 | * Online Reconstruction |
||
64 | 1 | Dobbs, Adam | * Data storage and movement |
65 | 9 | Gamet, Raymond | |
66 | * UPS |
||
67 | 6 | Gamet, Raymond | * RAID systems |
68 | * Data mover |
||
69 | * Controls and Monitoring |
||
70 | 10 | Gamet, Raymond | |
71 | 6 | Gamet, Raymond | * Run Control |
72 | * Alarm handler |
||
73 | * Environment readout |
||
74 | * Webcams |
||
75 | * DS |
||
76 | * Target |
||
77 | * Proton absorber |
||
78 | 1 | Dobbs, Adam | |
79 | |||
80 | h2. Offline Computing |
||
81 | |||
82 | * Full reconstruction chain with all detectors |
||
83 | * Global fits |
||
84 | * Data quality checks |
||
85 | * Automated grid batch processing |