Step4RunningRequirements » History » Revision 11
Revision 10 (Gamet, Raymond, 18 April 2014 14:59) → Revision 11/48 (Dobbs, Adam, 06 May 2014 15:12)
h1. Step 4 Running Requirements
h2. Personnel
* Pool of MOMs
* Pool of BLOCs
* Pool of SOCs
* DAQ experts
* Detector experts
* Pool of shifters
** 24 at current count, see http://micewww.pp.rl.ac.uk/projects/operations/wiki/Training_Shifters
* Shift allocation scheme and recording system
h2. Beamline
* Target
* Decay Solenoid
* Proton Absorbers
* Conventional Magnets
* Beam Stop
h2. Cooling Channel
* Spectrometer Solenoids
* Hydrogen delivery system
* FC1
* LH2 Absorber
* LiH Absorber
* Quench Protection and Monitoring
h2. Detectors
* CKOVs
* TOFs
* Tracker
* KL
* EMR
h2. Hall and Infrastructure
* Hall Services
* Neutron Monitor
* Oxygen depletion alarm
* PPS
* Clean (what standard?)
* Surveys
* PRY
* Cooler Compressors
* Vacuum System
* Power Systems
h2. DAQ
* DATE
* Run Control Interface
* Digitisation boards (-> FPGA system)
h2. Online Computing
* Online Monitoring
* Online Reconstruction
* Data storage and movement
* UPS
* RAID systems
* Data mover
* Controls and Monitoring
* Run Control
* Alarm handler
* Environment readout
* Webcams
* DS
* Target
* Proton absorber
h2. Offline Computing
* Full reconstruction chain with all detectors
* Global fits
* Data quality checks
* Automated grid batch processing