Project

General

Profile

Step4RunningRequirements » History » Version 1

Dobbs, Adam, 08 April 2014 14:26

1 1 Dobbs, Adam
h1. Step4RunningRequirements
2
3
h2. Personnel
4
5
* Pool of MOMs
6
* Pool of BLOCs
7
* Pool of SOCs
8
* DAQ experts
9
* Detector experts
10
* Pool of shifters
11
* Shift allocation scheme and recording system
12
13
h2. Beamline
14
15
h3. Target
16
17
h3. Conventional Magnets
18
19
h3. Decay Solenoid
20
21
h3. AFC
22
23
h3. SS
24
25
h3. Beam stop
26
27
h3. Proton absorbers
28
29
h2. Detectors
30
31
h2. DAQ
32
33
* DATE
34
* Run Control Interface
35
* Digitisation boards (-> FPGA system)
36
37
h2. PPS
38
39
h2. Online Computing
40
41
h3. Online Monitoring
42
43
h3. Online Reconstruction
44
45
h3. Data storage and movement
46
47
* UPS
48
* RAID systems
49
* Data mover
50
51
h3. Controls and Monitoring
52
53
* Run Control
54
* Alarm handler
55
* Environment readout
56
* Webcams
57
* DS
58
* Target
59
* Proton absorber
60
61
h2. Offline Computing
62
63
* Full reconstruction chain with all detectors
64
* Global fits
65
* Data quality checks
66
* Automated grid batch processing