ShifterTrainingTarget » History » Version 8
Nebrensky, Henry, 10 April 2015 18:31
BPS trip alert
1 | 1 | Nebrensky, Henry | h1. Shifter Training Syllabus for the Target (Spring 2015) |
---|---|---|---|
2 | |||
3 | 3 | Nebrensky, Henry | # Starting the relevant control screens |
4 | 1 | Nebrensky, Henry | # Start/Stop Actuation |
5 | # ISIS beamloss and target depth adjustment |
||
6 | # Pausing target operations: stop, withdraw, start, go deeper |
||
7 | # Raise and lower frame |
||
8 | # Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper |
||
9 | # Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper |
||
10 | # RF Hall (R5.4) access and the Target Frame Enable key |
||
11 | 3 | Nebrensky, Henry | # Errors and [[BeamlineProcsTargetFail|BPS Trip procedure]] |
12 | 4 | Nebrensky, Henry | ** RATS daemon crash symptoms |
13 | 6 | Nebrensky, Henry | attachment:RATS-20150410-SampleFailure.png |
14 | !http://micewww.pp.rl.ac.uk/attachments/download/3734! |
||
15 | 7 | Nebrensky, Henry | ** BPS trip alert |
16 | attachment:TargetQuadChannelFail.png |
||
17 | 8 | Nebrensky, Henry | !http://micewww.pp.rl.ac.uk/attachments/3735/TargetQuadChannelFail.png! |