Project

General

Profile

ShifterTrainingTarget » History » Revision 7

Revision 6 (Nebrensky, Henry, 10 April 2015 18:25) → Revision 7/12 (Nebrensky, Henry, 10 April 2015 18:31)

h1. Shifter Training Syllabus for the Target (Spring 2015) 

 # Starting the relevant control screens 
 # Start/Stop Actuation 
 # ISIS beamloss and target depth adjustment  
 # Pausing target operations: stop, withdraw, start, go deeper 
 # Raise and lower frame 
 # Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper 
 # Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper 
 # RF Hall (R5.4) access and the Target Frame Enable key 
 # Errors and [[BeamlineProcsTargetFail|BPS Trip procedure]] 
 ** RATS daemon crash symptoms 
 attachment:RATS-20150410-SampleFailure.png 
 !http://micewww.pp.rl.ac.uk/attachments/download/3734! 
 ** BPS trip alert 
 attachment:TargetQuadChannelFail.png