h1. Shifter Training Syllabus for the Target (Spring 2015)
# Starting the relevant control screens
# Start/Stop Actuation
# ISIS beamloss and target depth adjustment
# Pausing target operations: stop, withdraw, start, go deeper
# Raise and lower frame
# Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper
# Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper
# RF Hall (R5.4) access and the Target Frame Enable key
# Errors and [[BeamlineProcsTargetFail|BPS Trip procedure]]
** RATS daemon crash symptoms
attachment:RATS-20150410-SampleFailure.png
!http://micewww.pp.rl.ac.uk/attachments/download/3734!
** BPS trip alert
attachment:TargetQuadChannelFail.png