Shifter Training Syllabus for the Target (Spring 2015)¶
- Starting the relevant control screens
- Start/Stop Actuation
- ISIS beamloss and target depth adjustment
- Pausing target operations: stop, withdraw, start, go deeper
- Raise and lower frame
- Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper
- Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper
- RF Hall (R5.4) access and the Target Frame Enable key
- Errors and BPS Trip procedure
- RATS daemon crash symptoms