Project

General

Profile

Actions

ShifterTrainingTarget » History » Revision 6

« Previous | Revision 6/12 (diff) | Next »
Nebrensky, Henry, 10 April 2015 18:25


Shifter Training Syllabus for the Target (Spring 2015)

  1. Starting the relevant control screens
  2. Start/Stop Actuation
  3. ISIS beamloss and target depth adjustment
  4. Pausing target operations: stop, withdraw, start, go deeper
  5. Raise and lower frame
  6. Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper
  7. Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper
  8. RF Hall (R5.4) access and the Target Frame Enable key
  9. Errors and BPS Trip procedure

Updated by Nebrensky, Henry over 8 years ago · 6 revisions