ShifterTrainingTarget » History » Revision 3
Revision 2 (Nebrensky, Henry, 22 March 2015 17:03) → Revision 3/12 (Nebrensky, Henry, 22 March 2015 17:10)
h1. Shifter Training Syllabus for the Target (Spring 2015) # Starting the relevant control screens # Start/Stop Actuation # ISIS beamloss and target depth adjustment # Pausing target operations: stop, withdraw, start, go deeper # Raise and lower frame # Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper # Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper # RF Hall (R5.4) access and the Target Frame Enable key # Errors and [[BeamlineProcsTargetFail|BPS Trip procedure]]