BPS Trip procedure
1 | 1 | Nebrensky, Henry | h1. Shifter Training Syllabus for the Target (Spring 2015) |
---|---|---|---|
2 | |||
3 | # Start/Stop Actuation |
||
4 | # ISIS beamloss and target depth adjustment |
||
5 | # Pausing target operations: stop, withdraw, start, go deeper |
||
6 | # Raise and lower frame |
||
7 | # Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper |
||
8 | # Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper |
||
9 | # RF Hall (R5.4) access and the Target Frame Enable key |
||
10 | 2 | Nebrensky, Henry | # [[BeamlineProcsTargetFail|BPS Trip procedure]] |