BPS Trip procedure

1 1 Nebrensky, Henry
h1. Shifter Training Syllabus for the Target (Spring 2015)
2
3
# Start/Stop Actuation
4
# ISIS beamloss and target depth adjustment 
5
# Pausing target operations: stop, withdraw, start, go deeper
6
# Raise and lower frame
7
# Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper
8
# Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper
9
# RF Hall (R5.4) access and the Target Frame Enable key
10 2 Nebrensky, Henry
# [[BeamlineProcsTargetFail|BPS Trip procedure]]