ShifterTrainingTarget » History » Revision 10
Revision 9 (Nebrensky, Henry, 15 April 2015 17:53) → Revision 10/12 (Nebrensky, Henry, 29 May 2015 16:51)
h1. Shifter Training Syllabus for the Target (Spring 2015) # Starting the relevant control screens: RATS, (shifter) Target Drive, ISIS Beam Loss Display ## RATS: bookmarked in Firefox ## Target Drive !TargetDriveExpert.png! ## ISIS Beam Loss Display !ISIS-BLMdisplay1.png! screens # Start/Stop Actuation # ISIS beamloss and target depth adjustment # Pausing target operations: stop, withdraw, start, go deeper # Raise and lower frame # Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper # Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper # Vac-Rack and the Target Frame Enable key - NB requirement for _a priori_ RF Hall (R5.4) swipe access # Errors and [[BeamlineProcsTargetFail|BPS Trip procedure]] ** RATS daemon crash symptoms attachment:RATS-20150410-SampleFailure.png !http://micewww.pp.rl.ac.uk/attachments/download/3734! ** BPS trip alert attachment:TargetQuadChannelFail.png !http://micewww.pp.rl.ac.uk/attachments/3735/TargetQuadChannelFail.png!