h1. Shifter Training Syllabus for the Target (Spring 2015)
2
3 10 Nebrensky, Henry
# Starting the relevant control screens: RATS, (shifter) Target Drive, ISIS Beam Loss Display
4
## RATS: bookmarked in Firefox 
5
## Target Drive
6
   !TargetDriveExpert.png!
7
## ISIS Beam Loss Display
8
   !ISIS-BLMdisplay1.png!
9 1 Nebrensky, Henry
# Start/Stop Actuation
10
# ISIS beamloss and target depth adjustment 
11
# Pausing target operations: stop, withdraw, start, go deeper
12
# Raise and lower frame
13
# Controlled Entry: stop, withdraw, raise frame, lower frame, start, go deeper
14
# Overnight Standby: stop, withdraw, raise frame, park, brass key, hold, test, lower frame, start, go deeper
15 9 Nebrensky, Henry
# Vac-Rack and the Target Frame Enable key - NB requirement for _a priori_ RF Hall (R5.4) swipe access 
16 3 Nebrensky, Henry
# Errors and [[BeamlineProcsTargetFail|BPS Trip procedure]]
17 4 Nebrensky, Henry
** RATS daemon crash symptoms
18 6 Nebrensky, Henry
attachment:RATS-20150410-SampleFailure.png
19
!http://micewww.pp.rl.ac.uk/attachments/download/3734!
20 7 Nebrensky, Henry
** BPS trip alert
21
attachment:TargetQuadChannelFail.png 
22 8 Nebrensky, Henry
!http://micewww.pp.rl.ac.uk/attachments/3735/TargetQuadChannelFail.png!