Tuesday 24th Oct

  • Ramp down magnets
  • straight track data:
Task Momentum # Particle Triggers Beamline Tag ColingChannel Tag Absorber Tag Similar runs Final Event Tally (k)
S15a 170 2.2M 3-170+M3-Test1 FieldOff Empty LH2 Absorber 251k
S15b 200 2.9M 3-200+M3-Test2 FieldOff Empty LH2 Absorber 254k
S15c 140 2.4M 3-140+M3-Test3 FieldOff Empty LH2 Absorber 15k
S15d 240 3.9M 3-240+M3-Test1 FieldOff Empty LH2 Absorber

Shifter Information

Date Sun Oct 15 Mon Oct 16 Tue Oct 17 Wed Oct 18 Thur Oct 19 Fri Oct 20 Sat Oct 21
MOM M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida
BLOC J.Langland J.Langland J.Langland J.Langland H. Nebrenski H. Nebrenski H. Nebrenski
SOC D. Rajaram D. Rajaram D. Rajaram D. Rajaram D. Rajaram D. Rajaram D. Rajaram
Lead Shifter (00:00-08:00) A. Bross A. Bross A. Bross A. Bross M.Popovic M.Popovic M.Popovic
Shifter (00:00-08:00) M.Popovic M.Popovic M.Popovic M.Popovic D. Kaplan D. Kaplan D. Kaplan
Lead Shifter(08:00-16:00) C. Kyu.Sung C. Kyu.Sung C. Kyu.Sung C. Kyu.Sung P.Snopok P.Snopok P.Snopok
shifter 2 (08:00-16:00) Henry/Melissa V. Blackmore P.Franchini D. Rajaram P. Soler P. Soler P. Soler
Lead shifter (16:00-00:00) J. Nugent J. Nugent J. Nugent C.Whyte D. Sanders D. Sanders D. Sanders
Shifter 2 (16:00-00:00) J.Langland J.Langland J.Langland J.Langland L.Cremaldi L.Cremaldi L.Cremaldi
Additional Personnel
Notes
Date Oct 22 Oct 23 Oct 24 Oct 25 Oct 26 Oct 27
MOM M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida
BLOC H. Nebrenski H. Nebrenski S.Boyd S.Boyd S.Boyd H. Nebrenski
SOC D. Rajaram D. Rajaram D. Rajaram D. Rajaram D. Rajaram D. Rajaram
Lead Shifter (00:00-08:00) M.Popovic M.Popovic D. Neuffer D. Neuffer D. Neuffer D. Neuffer
Shifter (00:00-08:00) D. Kaplan D. Kaplan J. pasternak J. pasternak J. pasternak J. pasternak
Lead Shifter(08:00-16:00) P.Snopok P.Snopok S.Boyd S.Boyd S.Boyd
shifter 2 (08:00-16:00) P. Soler P. Soler A.DeBari A.DeBari A.DeBari
Lead shifter (16:00-00:00) D. Sanders D. Sanders M.Bonesi M.Bonesi M.Bonesi
Shifter 2 (16:00-00:00) L.Cremaldi L.Cremaldi L.Tortora L.Tortora L.Tortora
Additional Personnel
Notes

COMPLETED RUN PLANS

RunPlan20171015

Ramp FC
15 min pulser run
*Start with a 30min run of each setting then continue in two hour runs of each in turn below.

Task Momentum # Particle Triggers @TOF1 Beamline Tag ColingChannel Tag Absorber Tag Similar runs Final Event Tally (k)
H37a 170 1M 3-170+M3-Test1 2017-02-8 LH2 Absorber 908k
H37b 170 1M 6-170+M3-Test1 2017-02-8 LH2 Absorber 613k
H37c 170 2M 10-170+M3-Test1 2017-02-8 LH2 Absorber 540k
H37d 170 1M 6-170+M3-Test2 2017-02-8 LH2 Absorber 355k
H37e 170 2M 10-170+M3-Test2 2017-02-8 LH2 Absorber 262k

3mm - 908k, 6mm - 968k, 10mm - 802k.

Run Plan Monday 16th oct

  • 11am Empty Hydrogen vessel
  • while emptying take data. USE EMPTY ABSORBER TAG AND WRITE EMPTYING IN THE COMMENTS.
Task Momentum # Particle Triggers @TOF1 Beamline Tag ColingChannel Tag Absorber Tag Similar runs Final Event Tally (k)
H38a 170 full run 3-170+M3-Test1 2017-02-8 Emptying LH2 Absorber

NOTES FROM RUN: The system started bubbling at 12.15 at this point a change in transmission may be visible. At 17:00 the system is basically empty. 300mbar at 17:12.

  • When empty take the following:
Task Momentum # Particle Triggers @TOF1 Beamline Tag ColingChannel Tag Absorber Tag Similar runs Final Event Tally (k)
H39a 170 1M 3-170+M3-Test1 2017-02-8 Empty Absorber 266k
H39b 170 1M 6-170+M3-Test2 2017-02-8 Empty Absorber 567k
H39c 170 2M 10-170+M3-Test2 2017-02-8 Empty Absorber 242k

Note H37b and H37c are superseded by H37d and H37e respectively (better beamline tunes) data can be combined for analysis.

Run Plan until Monday 23rd Oct

change magnet currents to 2T flip mode 140MeV

Task Momentum # Particle Triggers Beamline Tag ColingChannel Tag Absorber Tag Similar runs Final Event Tally (k)
H40a 140 1M 3-140+M3-Test4 2017-02-7 Empty Absorber 1690
H40aa 140 1M 3-140+M3-Test3 2017-02-7 Empty Absorber 1600
H40b 140 1M 4-140+M3-Test1 2017-02-7 Empty Absorber 1610
H40c 140 1M 6-140+M3-Test2 2017-02-7 Empty Absorber 1610
H40d 140 2M 10-140+M3-Test4 2017-02-7 Empty Absorber 3350

Run plan Monday 23rd Oct

  • Move to 3T, Flip 170 MeV settings and complete data set below:
Task Momentum # Particle Triggers @TOF1 Beamline Tag ColingChannel Tag Absorber Tag Similar runs Final Event Tally (k)
H39a 170 1M 3-170+M3-Test1 2017-02-8 Empty Absorber 1021k
H39b 170 1M 6-170+M3-Test2 2017-02-8 Empty Absorber 1081
H39c 170 2M 10-170+M3-Test2 2017-02-8 Empty Absorber 1319k