Project

General

Profile

Actions

Run Plan 19/20 September 2017

Data taking during the filling of liquid hydrogen absorber with cooling channel magnets off.
The Decay Solenoid will stay at 200 A for all the settings.

Data Requested

  • Trackers calibration
  • Reference run
  • TOF calibration
  • Detectors alignment
  • Beam line tuning

Task Summary

TOF calibration

Task Momentum # Particle Triggers Beamline Tag CoolingChannel Tag Similar runs Final Event Tally (k)
S12a 150 1M @ TOF1 ToF-Calib+150-NoDS StepIV-Off new
S12b 300 1M @ TOF1 ToF-Calib-NoDS StepIV-Off 9311

Detector alignment

Task Momentum # Particle Triggers Beamline Tag ColingChannel Tag Similar runs Final Event Tally (k)
S13b 400 1000k at TOF1 400MeV+DS200 StepIV-Off 8041

Updated by Franchini, Paolo about 6 years ago · 11 revisions