RunPlan20161128 to Dec 16th 2016

Scattering data with field, backup plan for straight tracks.

Daily schedule from 28/Nov to 3/Dec.

We expect to be running with 2V beamloss. Note Decay Solenoid is ON. ISIS is at 40+10 and 700 MeV

Note:

Date Nov 28 Nov. 29 Nov. 30 Dec. 1 Dec. 2 Dec. 3
MOM E. Overton M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida
BLOC Y.Song Y.Song Y.Song Y.Song Y.Song R.Game
SOC D. Ragaram D. Ragaram D. Ragaram D. Ragaram D. Ragaram D. Ragaram
shifter 2 (08:00-16:00) Y.Song Y.Song Y.Song Y.Song Y.Song D.Bowring
Lead Shifter(08:00-16:00) P. Franchini P. Franchini P. Franchini P. Franchini P. Franchini R.Gamet
Lead shifter (16:00-00:00) D. Ragaram D. Ragaram D. Ragaram D. Ragaram D. Ragaram P.Soler
Shifter 2 (16:00-00:00) B.Freemire B.Freemire B.Freemire B.Freemire B.Freemire D.Maletic
Lead Shifter (00:00-08:00) G. Vankova G. Vankova G. Vankova G. Vankova G. Vankova B.Freemire 12-4
Shifter (00:00-08:00) J. Langlands J. Langlands J. Langlands J. Langlands J. Langlands P.Hanlet 4-8
Additional Personnel
Notes
Date Dec 4 Dec. 5 Dec. 6 Dec. 7 Dec. 8 Dec. 9
MOM M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida M. Uchida
BLOC R.Game R.Game R.Game R.Game J.Greis J.Greis
SOC D. Ragaram D. Ragaram D. Ragaram D. Ragaram D. Ragaram D. Ragaram
Lead shifter (08:00-16:00) R.Gamet R.Gamet R.Gamet R.Gamet S.Wilbur S.Wilbur
Shifter 2 (08:00-16:00) D.Bowring D.Bowring D.Bowring D.Bowring J.Greis J.Greis
Lead shifter (16:00-00:00) P.Soler P.Soler P.Soler P.Soler D.Neuffer D.Neuffer
Shifter 2 (16:00-00:00) D.Maletic D.Maletic D.Maletic D.Maletic D.Maletic D.Maletic
Lead Shifter (00:00-08:00) M.Courthold M.Courthold P.Kyberd P.Kyberd A.Bross A.Bross
Shifter (00:00-08:00) B.Freemrire B.Freemrire B.Freemrire B.Freemrire
Additional Personnel
Notes

Plan for 28/Nov-29/Nov:

Do 2 hours of each H4 task, then each H5 task until complete.

Data to take

Goal: Take some useful data for the experiment. We have two possible scenarios, we have magnets, or we don't. The request list for each scenario is below..

Field On Data

Do 2 hours of each H4 task, then each H5 task until complete.

Task H4 - Emittance Reduction!!

Task Momentum # Triggers Beamline Tag CoolingChannel Tag Similar runs
H4a 140 1e6 TOF1 3-140+M3-Test2 2016-04-01.2
H4b 140 1e6 TOF1 6-140+M3-Test2 2016-04-01.2
H4c 140 2e6 TOF1 10-140+M3-Test3 2016-04-01.2

Task H5 - Magnet alignment

Task Momentum # Triggers Beamline Tag CoolingChannel Tag Similar runs
H5a 170 5e5 TOF1 3-170+M3-Test1 2016-04-01.2
H5b 200 5e5 TOF1 3-200+M3_Test1 2016-04-01.2
H5c 240 5e5 TOF1 3-240+M3_Test1 2016-04-01.2

Straight track data (fallback)

Task S2: LiH scattering data.

Task Momentum # Triggers Beamline Tag CoolingChannel Tag Similar runs
S2a 140 1M @ TOF2 3-140+M3-Test2
S2b 200 ? 6-200+M0

Task S2a - 10M triggers at TOF1, 33 triggers/spill = 90 Hours data taking (15 shifts). Lots, but will make a
start anyway in case there is opportunity in later data taking for more running.

Physics post-processing

h2: Old daily schedules: