November 18-November 27th Plan

Scattering data with field, backup plan for straight tracks.

Daily schedule from 18/Nov to 27/Nov.

We expect to be running with 2V beamloss. Note Decay Solenoid is ON. ISIS is at 40+10 and 700 MeV

Date Nov 18 Nov. 19 Nov. 20 Nov. 21 Nov. 22
MOM E. Overton E. Overton E. Overton E. Overton E. Overton
BLOC Y.Song Y.Song Y.Song J. Langlands J. Langlands
SOC D. Ragaram D. Ragaram D. Ragaram D. Ragaram D. Ragaram
Lead shifter (08:00-16:00) Y.Song E. Overton J. Martyniak J. Ellison J. Ellison
Shifter 2 (08:00-16:00) J.Ellison J. Ellison J. Ellison H. Nebrensky H. Nebrensky
Lead shifter (16:00-00:00) K. Long F. Drielsma Y. Song Y. Song F. Drielsma
Shifter 2 (16:00-00:00) A. Liu A. Liu F. Drielsma F. Drielsma A. Liu
Magnet Monitor (00:00-08:00) F. Drielsma K. Long A. Liu A. Liu Y. Song
Shifter (00:00-08:00) D. Ragaram D. Ragaram + J Langlands
Additional Personnel P. Franchini P. Franchini
Notes Morning training
Afternoon magnet ramp
Date Nov 23 Nov. 24 Nov. 25 Nov. 26 Nov. 27
MOM E. Overton E. Overton E. Overton E. Overton E. Overton
BLOC J. Langlands J. Langlands J. Langlands S. Boyd S. Boyd
SOC D. Ragaram D. Ragaram D. Ragaram D. Ragaram D. Ragaram
Lead shifter (08:00-16:00) V. Blackmore J.B.Lagrange J.B.Lagrange S. Boyd S. Boyd
Shifter 2 (08:00-16:00) J. Langlands Y.Torn Y. Torn Y. Torn Y. Torn
Additional Personnel
Notes

Data to take

Goal: Take some useful data for the experiment. We have two possible scenarios, we have magnets, or we don't. The request list for each scenario is below..

Field On Data

Take task H1 first to give diagnostics data to check. Then move on to the official cooling data, start with task H2a, while settings for H2b,c are confirmed.

Task H1 (Done):

Test and optimise diffuser settings for 140MeV running

Task Momentum # Triggers Beamline Tag ColingChannel Tag Done
H1a 140 50k at TOF2 3-140+M3-Test2 2016-04-01.3 Y
H1b 140 50k at TOF2 6-140+M3-Test1 2016-04-01.3 Y
H1c 140 50k at TOF2 10-140+M3-Test1 2016-04-01.3 Y
H1d 140 10k at TOF2 Ao Special 2016-04-01.3 8577

Task H2 (Done):

Record data with 'official' settings

Task Momentum # Triggers Beamline Tag ColingChannel Tag Similar runs
H2a 140 1,000k at TOF2 3-140+M3-Test2 2016-04-01.3 ~400K TOF2
H2b 140 500k at TOF1 10-140+M3-Test2 2016-04-01.3 ~450K TOF1
H2c 140 500k+ at TOF1 6-140+M3-Test2 2016-04-01.3

Task H3 (Done):

Muon beam for comparing with 7469
Task Momentum # Triggers Beamline Tag ColingChannel Tag Similar runs
H3 140 2 hours 3-200+M0 2016-04-01.3

Tasks H4 + H5 moved to more recent run plan.

Straight track data (fallback)

Task S1: Detector alignment

Task Momentum # Triggers Beamline Tag ColingChannel Tag Similar runs Done
S1a 200 200k at TOF1 6-200+M0 8037 Y
S1b 300 1000k at TOF1 300MeV+pi pa82 8030 Y
S1c 400 200k at TOF1 400MeV+pi pa82 8041 Y
S1d 200 200k at TOF1 3-200+M3-Test1 8035 Y

Task S2: LiH scattering data - Moved to more recent plan.

TOF Calibration ? - Not needed/ Not done.

Todo:
+ Get settings from Durga

Physics post-processing