Run Plan 29th Sep - 2nd October

Straight tracks data - TOF calibration and detector alignment.

Daily schedule

29/09 30/09 01/10 02/10
estimated time TBD, 16:00 - 24:00 TBD, 16:00 - 24:00 TBD, 10am - 6pm 10am - 6pm
MOM C. Rogers C. Rogers C. Rogers C. Rogers
Lead shifter R. Gamet R. Gamet R. Gamet R. Gamet
Shifter 2 S. Wilbur S. Wilbur S. Wilbur S. Wilbur
BLOC Y. Song Y. Song Y. Song Y. Song
Beam? Yes Yes Yes Yes
Additional Personnel

Data Requested

  • TOF calibration
  • Detector alignment
  • Beamline studies

Beamline Configurations

We expect to be running with 2V beamloss and beam bump active. Note Decay Solenoid is OFF.

Reference Run without Decay Solenoid

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Ran? Similar Run(s)
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
pion 272.42 268.67 265.98 143.4 29 57.8 105.6 64.6 202.8 ---- 100.4 176.8 237.1 157.2 157.6 238.5 203.7

Task 1: TOF Calibration

Task Description Momentum # Triggers # shifts SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2 RunControl Tag
1 TOF Calibration 300 MeV/c 500k @ TOF1 1 N N/N N N N/N ToF-Calib-NoDS

Task 2: Detector alignment

Task 2a: 200 MeV/c

Particle Species Pz @ TKU Station 5 Proton Absorber Diffuser setting Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 RunControl Tag
MeV/c mm A A A A A A A A A A A A
muons/pions 200 29 no diffuser 51.63 94.37 57.74 180.7 94.91 159.44 213.82 141.76 69.99 105.93 90.44 3-200+M3-NoDS-Test1

Task 2b: 300 MeV/c

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
# V mm A A A A A A A A A A A A A A A A DAQ run #
1000k TOF1 1 Pion 300.0 82 72.7 133.0 81.4 261.1 ---- 131.5 244.3 300.6 199.4 204.7 309.9 264.9 -- Alignment_300_noDS-test1

Task 2c: 400 MeV/c

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
# V mm A A A A A A A A A A A A A A A A DAQ run #
200k TOF1 1 Pion 400.0 82 96.55 176.6 108.1 370.1 ---- 170 213.1 285.7 189.5 193.7 293.3 250.6 -- Alignment_400_noDS-test1

Task 3: Beamline optimisation

By Paolo's command - ad hoc settings that Paolo will provide.

Operations meeting 2016-09-28

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

16:00 BST

Agenda:
1. Tracker DAQ (Ed Overton)
2. Beamline water (Henry Nebrensky/DC)
3. ISIS status (MOM)
4. Run plan (MOM)
  • Propose Thursday ops meeting at 13:00 16:00 then start shift
  • Propose Friday ops meeting at 10:00 16:00 then start shift
  • Propose Saturday ops meeting at 10:00 then start shift
  • Propose Sunday ops meeting at 10:00 then start shift

Notes

Operations meeting 2016-09-29

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

16:00 BST

Agenda:
1. Tracker DAQ (Ed Overton)
2. Beamline water (Henry Nebrensky/DC)
3. ISIS status (MOM)
4. Run plan (MOM)
  • Propose Friday ops meeting at 10:00 16:00 then start shift
  • Propose Saturday ops meeting at 10:00 then start shift
  • Propose Sunday ops meeting at 10:00 then start shift

Notes: ISIS is still off - shift cancelled; reconvene tomorrow for evening shift

Operations meeting 2016-09-30

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

16:00 BST

Agenda:
1. Tracker DAQ (Ed Overton)
2. Beamline water (Henry Nebrensky/DC)
3. ISIS status (MOM)
4. Run plan (MOM)
  • Propose Friday ops meeting at 10:00 16:00 then start shift
  • Propose Saturday ops meeting at 10:00 then start shift
  • Propose Sunday ops meeting at 10:00 then start shift

Notes

Updated by Franchini, Paolo almost 7 years ago ยท 17 revisions