Actions
Run Plan 29th Sep - 2nd October¶
Straight tracks data - TOF calibration and detector alignment.
Daily schedule¶
29/09 | 30/09 | 01/10 | 02/10 | |
estimated time | TBD, 16:00 - 24:00 | TBD, 16:00 - 24:00 | TBD, 10am - 6pm | 10am - 6pm |
MOM | C. Rogers | C. Rogers | C. Rogers | C. Rogers |
Lead shifter | R. Gamet | R. Gamet | R. Gamet | R. Gamet |
Shifter 2 | S. Wilbur | S. Wilbur | S. Wilbur | S. Wilbur |
BLOC | Y. Song | Y. Song | Y. Song | Y. Song |
Beam? | Yes | Yes | Yes | Yes |
Additional Personnel |
Data Requested¶
- TOF calibration
- Detector alignment
- Beamline studies
Beamline Configurations¶
We expect to be running with 2V beamloss and beam bump active. Note Decay Solenoid is OFF.
Reference Run without Decay Solenoid¶
Particle Species | p at Tgt | p@D1 | p@D2 | p@Tof0 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Ran? | Similar Run(s) |
MeV/c | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | ||
pion | 272.42 | 268.67 | 265.98 | 143.4 | 29 | 57.8 | 105.6 | 64.6 | 202.8 | ---- | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 |
Task 1: TOF Calibration¶
Task | Description | Momentum | # Triggers | # shifts | SSU (ECE) | SSU M1/M2 | FC | SSD (ECE) | SSD M1/M2 | RunControl Tag |
1 | TOF Calibration | 300 MeV/c | 500k @ TOF1 | 1 | N | N/N | N | N | N/N | ToF-Calib-NoDS |
Task 2: Detector alignment¶
Task 2a: 200 MeV/c¶
Particle Species | Pz @ TKU Station 5 | Proton Absorber | Diffuser setting | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | RunControl Tag |
MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | |||
muons/pions | 200 | 29 | no diffuser | 51.63 | 94.37 | 57.74 | 180.7 | 94.91 | 159.44 | 213.82 | 141.76 | 69.99 | 105.93 | 90.44 | 3-200+M3-NoDS-Test1 |
Task 2b: 300 MeV/c¶
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) | Run Tag |
# | V | mm | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | |
1000k TOF1 | 1 | Pion | 300.0 | 82 | 72.7 | 133.0 | 81.4 | 261.1 | ---- | 131.5 | 244.3 | 300.6 | 199.4 | 204.7 | 309.9 | 264.9 | -- | Alignment_300_noDS-test1 |
Task 2c: 400 MeV/c¶
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) | Run Tag |
# | V | mm | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | |
200k TOF1 | 1 | Pion | 400.0 | 82 | 96.55 | 176.6 | 108.1 | 370.1 | ---- | 170 | 213.1 | 285.7 | 189.5 | 193.7 | 293.3 | 250.6 | -- | Alignment_400_noDS-test1 |
Task 3: Beamline optimisation¶
By Paolo's command - ad hoc settings that Paolo will provide.
Operations meeting 2016-09-28¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
16:00 BST
Agenda:1. Tracker DAQ (Ed Overton)
2. Beamline water (Henry Nebrensky/DC)
3. ISIS status (MOM)
4. Run plan (MOM)
- Propose Thursday ops meeting at
13:0016:00 then start shift - Propose Friday ops meeting at
10:0016:00 then start shift - Propose Saturday ops meeting at 10:00 then start shift
- Propose Sunday ops meeting at 10:00 then start shift
Operations meeting 2016-09-29¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
16:00 BST
Agenda:1. Tracker DAQ (Ed Overton)
2. Beamline water (Henry Nebrensky/DC)
3. ISIS status (MOM)
4. Run plan (MOM)
- Propose Friday ops meeting at
10:0016:00 then start shift - Propose Saturday ops meeting at 10:00 then start shift
- Propose Sunday ops meeting at 10:00 then start shift
Notes: ISIS is still off - shift cancelled; reconvene tomorrow for evening shift
Operations meeting 2016-09-30¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
16:00 BST
Agenda:1. Tracker DAQ (Ed Overton)
2. Beamline water (Henry Nebrensky/DC)
3. ISIS status (MOM)
4. Run plan (MOM)
- Propose Friday ops meeting at
10:0016:00 then start shift - Propose Saturday ops meeting at 10:00 then start shift
- Propose Sunday ops meeting at 10:00 then start shift
Notes
Updated by Franchini, Paolo almost 7 years ago ยท 17 revisions