Summary of aims and timing of the run.

Daily schedule

Month Day 1 Day 2
estimated time 8am - 4pm 4pm - 11:59pm
MOM C.Rogers/P. Franchini C. Rogers/P. Franchini
Lead shifter M. Savic M. Bogomilov
Shifter 2 C. Heidt K. Long
BLOC C. Heidt C.Heidt
Beam? Yes Yes
Additional Personnel

Data Requested

  • Aim is to get a running configuration in the Control Room

Beamline Configurations

We expect to be running with 2V beamloss and beam bump active.

Reference Run without Decay Solenoid

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Ran? Similar Run(s)
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
pion 272.42 268.67 265.98 143.4 29 57.8 105.6 64.6 202.8 ---- 100.4 176.8 237.1 157.2 157.6 238.5 203.7