RunPlan20160719

Daily schedule

Days 19th July 2016
estimated time 14:00 -
MOM P. Kyberd
Lead shifter
Shifter 2
BLOC Ian Greis
SOC
Experimenter
OnCall DC
Aim
Beam? Yes

Shift plan:

Beamline Configurations

No cooling channel
No Focus Coil
SSD ON

Task 0: Reference run

Task 3c: 400 MeV/c (Final setting after the D2/quads tuning)

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
# V mm A A A A A A A A A A A A A A A A DAQ run #
200k TOF1 1 Pion 400.0 82 113.7 142.2 98.9 370.1 743.66 170 213.1 285.7 189.5 193.7 293.3 250.6 -- Individual settings

Backup plan: Task 3b: 300 MeV/c

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
# V mm A A A A A A A A A A A A A A A A DAQ run #
1000k TOF1 1 Pion 300.0 82 85.6 107.1 74.8 261.1 445.8 131.5 244.3 300.6 199.4 204.7 309.9 264.9 7418, 7627 Individual settings