Project

General

Profile

Actions

RunPlan 14th July 2016

Daily schedule

Days 14th July 2016
estimated time 9:00 - 17:00
MOM P. Kyberd
Lead shifter Pavel Snopok
Shifter 2 Kevin Ronald
BLOC Joe Langlands
SOC
Experimenter C. Rogers
OnCall DC V. Blackmore
Aim Focus Coil alignment
Beam? Yes

Shift plan:

08.30: Daily operation meeting
09:00: MOM and BLOC start-up
17:00: End of the shift

Beamline Configurations

No cooling channel
Focus Coil ON @ 50 amps

Task 0: Reference run

Task 5: FC alignment

Task Description Momentum # Triggers # shifts SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2 Run control tag
5a Focus coil alignment - sol 200 100k at TOF2 0.5 N N/N Solenoid N N/N 3-200+M3-Test1
5b Focus coil alignment - sol 300 150k at TOF2 0.2 N N/N Solenoid N N/N Custom
5c Focus coil alignment - sol 400 100k at TOF2 0.03 N N/N Solenoid N N/N Custom

Current settings for Run 5b

Particle Species p at Tgt Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
MeV/c mm A A A A A A A A A A A A DAQ run #
Pion 300.0 82 85.6 107.1 74.8 261.1 445.8 131.5 244.3 300.6 199.4 204.7 309.9 264.9 8012, 8013, 8014 Individual settings

Current settings for Run 5c

Particle Species p at Tgt Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
MeV/c mm A A A A A A A A A A A A DAQ run #
Pion 400.0 82 113.7 142.2 98.9 370.1 743.66 170 213.1 285.7 189.5 193.7 293.3 250.6 8004 Individual settings

Daily Operations meeting

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592

Access Code: 2155402

References

Updated by Franchini, Paolo about 7 years ago ยท 14 revisions