Project

General

Profile

Actions

RunPlan 16 July 2016

Daily schedule

Days 16th July 2016
estimated time 9:00 - 17:00
MOM P. Kyberd
Lead shifter Pavel Snopok
Shifter 2 Kevin Ronald
BLOC Joe Langlands
SOC N/A
Experimenter Chris Rogers
OnCall DC V. Blackmore
Aim Straight tracks
Beam? Yes

Shift plan:

10:00: Daily operation meeting
18:00: End of the shift

Beamline Configurations

No cooling channel
No Focus Coil

Task 0: Reference run

Task 3: Detector alignment

Task 3a: 300 MeV/c

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
# V mm A A A A A A A A A A A A A A A A DAQ run #
1000k TOF1 1 Pion 300.0 82 85.6 107.1 74.8 261.1 445.8 131.5 244.3 300.6 199.4 204.7 309.9 264.9 7418, 7627 Individual settings

Task 3b: 200 MeV/c (repeat FC alignment/new beamline setting with straight tracks)

Task Description Momentum # Triggers # shifts SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2 Run control tag
3b Straight tracks alignment - new beamline setting 200 200k at TOF1 1.5 N N/N N N N/N 3-200+M3-Test1

Task 3c: 400 MeV/c (Final setting after the D2/quads tuning)

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) Run Tag
# V mm A A A A A A A A A A A A A A A A DAQ run #
200k TOF1 1 Pion 400.0 82 113.7 142.2 98.9 370.1 743.66 170 213.1 285.7 189.5 193.7 293.3 250.6 -- Individual settings

Task 3d: 200 MeV/c (repeat July 9th setting)

Task Momentum # Triggers SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2 RunControl Tag
3d 200 200k at TOF1 N N/N N N N/N 6-200+M0

Daily Operations meeting

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592

Access Code: 2155402

References

Updated by Boyd, Steven about 7 years ago ยท 16 revisions