RunPlan 08 July 2016

Daily schedule

Days 8th July 2016
estimated time 12:00 - 20:00
MOM P. Franchini
Lead shifter M. Bogomilov
Shifter 2 G. Vankova
BLOC C. Rogers
SOC
Experimenter
OnCall DC V. Blackmore
Aim SSU on!
Beam? Yes

Shift plan:

09:00: Ramp up of SSU (ECE)
11.00: Daily operation meeting
12:00: MOM and BLOC start-up
17:00: Ramp down of SSU (ECE)
20:00: End of the shift

Beamline Configurations

No Focus Coil
SSU ECE On

Task 0: Reference run

Task 6a: SSU alignment

Description Momentum # Triggers SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2
SSU alignment 200 until 5pm Y N N N N/N
RunControl TAG E2u Cu E1u M2u M1u FCu FCd M1d M2d E1d Cd E2d
Sol_200_??? 179.44 206.19 209.91 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Daily Operations meeting

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592

Access Code: 2155402