RunPlan 06 July 2016

Daily schedule

Days 6th July 2016
estimated time 9:00 - 17:00
MOM P. Franchini
Lead shifter R. Gamet
Shifter 2 M. Bogomilov
BLOC H. Nebrensky
SOC
Experimenter D. Rajaram
OnCall DC C. Macwaters
Aim Straight track data: TOF calibration
Beam? Yes

Shift plan:

08:00: Intervention on the Q1 power supply (Henry)
08.30: Daily operation meeting
08:45: DC/MOM handover
09:00: MOM and BLOC start-up
17:00: End of the shift

Beamline Configurations

No cooling channel
No Focus Coil
DS ON

Data Requested

Task 0: Reference run

Task 1: TOF Calibration

Task Description Momentum # Triggers # shifts SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2 RunControl Tag
1 TOF Calibration 300 MeV/c 500k @ TOF1 1 N N/N N N N/N ToF-Calib+300

Daily Operations meeting

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592

Access Code: 2155402

References

Updated by Franchini, Paolo about 7 years ago ยท 37 revisions