Daily Run Plan 24th March 2016

Daily schedule

Days 24 Mar
estimated time 00:00 - 08:00 08:00 - 16:00 16:00 - 00:00
MOM R. Bayes R. Bayes R. Bayes
Lead shifter J. Nugent F. Drielsma P.Franchini
Shifter 2 C. Rogers S. Boyd E. Overton
BLOC J. Langlands V. Blackmore V. Blackmore
SOC C. Heidt C. Heidt C. Heidt
Experimenter J. Nugent J. Nugent J. Nugent
Aim LiH absorber data LiH absorber data LiH absorber data
Beam? Yes Yes Yes

Shift plan:

  • 00:00 : start of shift 1
  • 07:55 : end of shift 1
  • 08:00 : start of shift 2
  • 15:55 : end of shift 2
  • 16:00 : start of shift 3
  • 23:30 : Stop data-taking
  • 00:00 : end of shift. Full shut down (BLOC and MOM).

Beamline Configurations

We expect to be running with 1-2 beamloss and beam bump active.
DS to be available after morning ramp on Saturday 12th March

Data Requested

  • Tracker calibration (standard procedure)
  • Pion reference run
  • Muon beam scattering in LiH
    • 100k Good Muons : (3, 200) Muon Beam with DS (Now complete)
    • 100k Good Muons : (3, 240) Muon Beam with DS
    • 100k Good Muons : (3, 172) Muon Beam with DS (Now complete)

Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day)

Task 1: Muon Beam Scattering Studies:

Complete LiH absorber scattering data. Take [3, 240] beam until complete (equal statistics to [3,172] beam).

Each run will take approximately 2 hours.

Data rate is approximately 2k good muons per hour.

Task 1a : LiH absorber data : 100k Good Muons : (3, 200) Muon Beam with DS

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers Tag
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
muon 83 97.7 122.0 84.9 305.0 637.9 91.5 153.4 205.7 136.4 133.9 202.5 172.9 600k 3-200+M0

Task 1b : LiH absorber data : 100k Good Muons : (3, 240) Muon Beam with DS

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers Tag
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
muon -- -- -- -- 147 113.7 142.1 98.9 370.5 743 104.4 176.2 236.3 156.7 157.0 237.6 203.0 600k 3-240+M0

Task 1c : LiH absorber data : 100k Good Muons : (3, 172) Muon Beam with DS (settings from this spreadsheet)

Particle Species p at Tgt pSol pDiff p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers Tag
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
pion/muon 390 221 179.4 78 97.69 122.04 84.91 304.97 637.88 87.69 146.70 196.73 130.40 126.96 192.07 163.96 600k 3-172+M0

Phone details for 3:30pm daily run meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402