Daily Run Plan 18th March 2016

Daily schedule

Days 18 Mar
estimated time 08:00 - 16:00 16:00 - 00:00
MOM R. Bayes R. Bayes
Lead shifter D. Sanders C. Hunt
Shifter 2 L. Cremaldi S. Ricciardi
BLOC V. Blackmore V. Blackmore
SOC J. Nugent J. Nugent
Experimenter J. Nugent J. Nugent
Aim LiH absorber data LiH absorber data
Beam? Yes Yes

Shift plan:

  • 07:30 : MOM and BLOC start-up
  • 08:00 : start of shift 1
  • 10:30 - 12:00 : Hall open for safety walk through and PPS training.
  • 12:00 : resume data collection (remaining hall training in parallel with data collection).
  • 15:55 : end of shift 1
  • 16:00 : start of shift 2
  • 23:30 : Stop data-taking
  • 00:00 : end of shift

Beamline Configurations

We expect to be running with 1-2 beamloss and beam bump active.
DS to be available after morning ramp on Saturday 12th March

Data Requested

  • Tracker calibration (standard procedure)
  • Pion reference run
  • DAQ stress test
  • Muon beam scattering in LiH

Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day)

Task 1: Muon Beam Scattering Studies:

Will repeat zero absorber studies with LiH. Cycle through each setting on a run by run basis with each run taking approximately 2 hours.

Data rate is approximately 2k good muons per hour.

Task 1a : LiH absorber data : 100k Good Muons : (3, 200) Muon Beam with DS

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers Tag
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
muon 83 97.7 122.0 84.9 305.0 637.9 91.5 153.4 205.7 136.4 133.9 202.5 172.9 600k 3-200+M0

Task 1b : LiH absorber data : 100k Good Muons : (3, 240) Muon Beam with DS

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers Tag
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
muon -- -- -- -- 147 113.7 142.1 98.9 370.5 743 104.4 176.2 236.3 156.7 157.0 237.6 203.0 600k 3-240+M0

Task 1c : LiH absorber data : 100k Good Muons : (3, 172) Muon Beam with DS (settings from this spreadsheet)

Particle Species p at Tgt pSol pDiff p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers Tag
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
pion/muon 390 221 179.4 78 97.69 122.04 84.91 304.97 637.88 87.69 146.70 196.73 130.40 126.96 192.07 163.96 600k 3-172+M0

Phone details for 3:30pm daily run meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Bayes, Ryan over 7 years ago ยท 3 revisions