RunPlan20160315 » History » Version 3
MOM, Mice Operations Manager, 15 March 2016 09:19
1 | 2 | MOM, Mice Operations Manager | h1. Daily Run Plan 15th and 16th March 2016 |
---|---|---|---|
2 | 1 | MOM, Mice Operations Manager | |
3 | h3. Daily schedule |
||
4 | |||
5 | 2 | MOM, Mice Operations Manager | | Days | 15-16 Mar | | |
6 | 1 | MOM, Mice Operations Manager | | estimated time | 08:00 - 16:00 | 16:00 - 00:00 | |
7 | | MOM | R. Bayes |R. Bayes | |
||
8 | 3 | MOM, Mice Operations Manager | | Lead shifter | D. Sanders | C. Hunt | |
9 | 1 | MOM, Mice Operations Manager | | Shifter 2 | L. Cremaldi | S. Ricciardi | |
10 | | BLOC | A. Dobbs | A. Dobbs | |
||
11 | | SOC | J. Nugent | J. Nugent | |
||
12 | | Experimenter | J. Nugent | J. Nugent| |
||
13 | | | | | |
||
14 | | Aim | LiH absorber data |LiH absorber data | |
||
15 | |Beam? | Yes |Yes | |
||
16 | |||
17 | |||
18 | |||
19 | h2. Shift plan: |
||
20 | |||
21 | * 07:30 : MOM and BLOC start-up |
||
22 | * 08:00 : start of shift 1 |
||
23 | 2 | MOM, Mice Operations Manager | * ??:00 on the 15th: DAQ test |
24 | 1 | MOM, Mice Operations Manager | * 15:55 : end of shift 1 |
25 | * 16:30 : start of shift 2 |
||
26 | * 23:30 : Stop data-taking, full shutdown of target, unlock and open hall |
||
27 | * 00:00 : end of shift |
||
28 | |||
29 | h2. Beamline Configurations |
||
30 | |||
31 | We expect to be running with 1-2 beamloss and beam bump active. |
||
32 | DS to be available after morning ramp on Saturday 12th March |
||
33 | |||
34 | h2. Data Requested |
||
35 | |||
36 | * Tracker calibration (standard procedure) |
||
37 | * Pion reference run |
||
38 | * DAQ stress test |
||
39 | * Muon beam scattering in LiH |
||
40 | |||
41 | h3. Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day) |
||
42 | |||
43 | h3. Task 1: DAQ stress test. |
||
44 | |||
45 | * Requested 1 hour with a TOF1 rate greater than 200 counts/spill. |
||
46 | * Should be reasonable with reference beam with DS. |
||
47 | * Ensure that Yordan knows when these data are to be taken. |
||
48 | |||
49 | h3. Task 2: Muon Beam Scattering Studies: |
||
50 | |||
51 | Will repeat zero absorber studies with LiH |
||
52 | |||
53 | h3. Task 2a : LiH absorber data : 600k TOF2 triggers : (3, 200) Muon Beam with DS |
||
54 | |||
55 | | Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag | |
||
56 | | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | |
||
57 | | muon| | | | | 83 | 97.7 | 122.0 | 84.9 | 305.0 | 637.9| 91.5 | 153.4 | 205.7 | 136.4 | 133.9 | 202.5 | 172.9 | 600k | 3-200+M0 | |
||
58 | |||
59 | h3. Task 2b : LiH absorber data : 600k TOF2 triggers : (3, 240) Muon Beam with DS |
||
60 | |||
61 | | Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag | |
||
62 | | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | |
||
63 | | muon|-- | --| --|-- | 147 | 113.7 | 142.1 | 98.9 | 370.5 | 743 | 104.4 | 176.2 | 236.3 | 156.7| 157.0 | 237.6 | 203.0 | 600k | 3-240+M0 | |
||
64 | |||
65 | h3. Task 2c : LiH absorber data : 600k TOF2 triggers : (3, 172) Muon Beam with DS ("settings from this spreadsheet":http://micewww.pp.rl.ac.uk/attachments/5813/3_172_muon_beam.xls) |
||
66 | |||
67 | | Particle Species| p at Tgt | pSol| pDiff| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag | |
||
68 | | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | |
||
69 | | pion/muon| 390 |221 | 179.4 | | 78 | 97.69 | 122.04 | 84.91 | 304.97 | 637.88 | 87.69 | 146.70 | 196.73 | 130.40| 126.96 | 192.07 | 163.96 | 600k | 3-172+M0 | |