Project

General

Profile

RunPlan20160315 » History » Version 1

MOM, Mice Operations Manager, 14 March 2016 11:33

1 1 MOM, Mice Operations Manager
2
h1. Daily Run Plan 14th March 2016
3
4
h3. Daily schedule
5
6
| Days | 14 Mar | |
7
| estimated time | 08:00 - 16:00 | 16:00 - 00:00 |
8
| MOM | R. Bayes |R. Bayes |
9
| Lead shifter | D. Saunders | C. Hunt |
10
| Shifter 2 |  L. Cremaldi | S. Ricciardi |
11
| BLOC | A. Dobbs | A. Dobbs |
12
| SOC | J. Nugent | J. Nugent |
13
| Experimenter | J. Nugent | J. Nugent|
14
| | | |
15
| Aim | LiH absorber data |LiH absorber data |
16
|Beam? | Yes |Yes |
17
18
19
20
h2. Shift plan:
21
22
* 07:30 : MOM and BLOC start-up
23
* 08:00 : start of shift 1
24
* ??:00 : DAQ test
25
* 15:55 : end of shift 1
26
* 16:30 : start of shift 2
27
* 23:30 : Stop data-taking, full shutdown of target, unlock and open hall
28
* 00:00 : end of shift
29
30
h2. Beamline Configurations
31
32
We expect to be running with 1-2 beamloss and beam bump active.
33
DS to be available after morning ramp on Saturday 12th March
34
35
h2. Data Requested
36
37
* Tracker calibration (standard procedure)
38
* Pion reference run
39
* DAQ stress test
40
* Muon beam scattering in LiH
41
42
h3. Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day) 
43
44
h3. Task 1: DAQ stress test.
45
46
* Requested 1 hour with a TOF1 rate greater than 200 counts/spill.
47
* Should be reasonable with reference beam with DS.
48
* Ensure that Yordan knows when these data are to be taken.
49
50
h3. Task 2: Muon Beam Scattering Studies:
51
52
Will repeat zero absorber studies with LiH
53
54
h3. Task 2a : LiH absorber data : 600k TOF2 triggers : (3, 200) Muon Beam with DS
55
56
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag |
57
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
58
| muon| | | | | 83 | 97.7 | 122.0 | 84.9 | 305.0 | 637.9| 91.5 | 153.4 | 205.7 | 136.4 | 133.9 | 202.5 | 172.9 | 600k | 3-200+M0 |
59
60
h3. Task 2b : LiH absorber data : 600k TOF2 triggers : (3, 240) Muon Beam with DS
61
62
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag |
63
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
64
| muon|-- | --| --|-- | 147 | 113.7 | 142.1 | 98.9 | 370.5 | 743 | 104.4 | 176.2 | 236.3 | 156.7| 157.0 | 237.6 | 203.0 | 600k | 3-240+M0 |
65
66
h3. Task 2c : LiH absorber data : 600k TOF2 triggers : (3, 172) Muon Beam with DS ("settings from this spreadsheet":http://micewww.pp.rl.ac.uk/attachments/5813/3_172_muon_beam.xls)
67
68
| Particle Species| p at Tgt | pSol| pDiff| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag |
69
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
70
| pion/muon| 390 |221 | 179.4 | | 78 | 97.69 | 122.04 | 84.91 | 304.97 | 637.88 | 87.69 | 146.70 | 196.73 | 130.40| 126.96 | 192.07 | 163.96 | 600k | 3-172+M0 |