RunPlan20160228-0304 » History » Version 4

Liu, Ao, 29 February 2016 15:48

1 1 Boyd, Steven
h1. Daily Run plan : Feb 28 - Mar 3, 2016
2
3
h3. Daily schedule
4
5 2 Boyd, Steven
| Days | 25 Feb - 3 Mar | |
6 1 Boyd, Steven
| estimated time |  | 17:00 - 00:00 |
7
| MOM | P. Kyberd | |
8
| Lead shifter |   | G. Vankova |
9
| Shifter 2 |    | C. Hunt |
10
| BLOC |  | |
11
| SOC |  ||
12
| Experimenter | J. Nugent ||
13
| | ||
14
| Aim | Empty absorber data | |
15
|Beam? | Yes ||
16
17
18
h2. Shift plan:
19
20
* 16:00 : Daily run meeting
21
* 16:30 : Close up Hall and prepare for running
22
* 17:00 : start of shift
23
* 23:30 : Stop data-taking, full shutdown of target, unlock and open hall
24
* 00:00 : end of shift
25
26
h2. Beamline Configurations
27
28
We expect to be running with 1-2 beamloss and beam bump active.
29
No DS.
30
31
h2. Data Requested
32
33
* Tracker calibration (standard procedure)
34
* Pion reference run
35
* TOF Calibration
36
37
h3. Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day) 
38
39
h3. Task 1 : Zero absorber data : 600k TOF2 triggers : (3,172) Pion Beam
40
41
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|
42
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
43
| pion| 232.5|228.41|225.44| 222.37| 78 | 49.14 | 89.82 | 54.95 | 171.69 | ----| 85.71 | 149.6 | 200.62 | 132.94 | 129.11 | 195.26 | 166.61 | 600k|
44
45
h3. Task 2 : Zero absorber data : 600k TOF2 triggers : (3, 200) Pion Beam
46
47
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|
48
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
49
| pion| 256|252.14|249.35| 246.46| 83 | 54.22 | 99.11 | 60.65 | 189.84 | ----| 94.4 | 165.67 | 222.17 | 147.28 | 146.06 | 220.98 | 188.68 | 600k |
50
51 3 Liu, Ao
h3. Task 3 (backup run plan): Ckov momentum scan for higher momentum pion beam
52 4 Liu, Ao
53 3 Liu, Ao
h4. Let's aim at 3000 pluses for each of the settings below. 
54 4 Liu, Ao
55 3 Liu, Ao
Please consult the beamline specialists on whether the current exceeds the limits. 
56
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|
57
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
58
| pion| 320 |316.48 |313.97|  | 29 | 68.0  | 124.3 | 76.1 | 241.7  | 0  | 117.8 | 209.0 | 280.3  | 185.9 | 190.3 | 288.1 | 246.2 | --- |
59
| pion| 340 |336.55 |334.09|  | 29 | 72.3  | 132.2 | 80.9 | 258.9  | 0  | 125.1 | 222.5 | 298.4  | 198.0 | 203.8 | 308.6 | 263.7 | --- |
60
| pion| 340 |356.60 |354.18|  | 29 | 76.6  | 140.1 | 85.7 | 276.7  | 0  | 132.4 | 236.0 | 316.4  | 210.0 | 217.3 | 329.0 | 281.2 | --- |
61
62 1 Boyd, Steven
h2. Phone details for 4pm daily run meeting
63
64
Phone access :  ReadyTalk number 
65
66
US 866-740-1260
67
68
UK 0800-496-0576
69
70
Swiss 0800-70-53-51
71
72
Italy 800182592
73
74
Access Code: 2155402