h1. Daily Run plan : Feb 28 - Mar 3, 2016
2
3
h3. Daily schedule
4
5 2 Boyd, Steven
| Days | 25 Feb - 3 Mar | |
6 1 Boyd, Steven
| estimated time |  | 17:00 - 00:00 |
7
| MOM | P. Kyberd | |
8
| Lead shifter |   | G. Vankova |
9
| Shifter 2 |    | C. Hunt |
10
| BLOC |  | |
11
| SOC |  ||
12
| Experimenter | J. Nugent ||
13
| | ||
14
| Aim | Empty absorber data | |
15
|Beam? | Yes ||
16
17
18
h2. Shift plan:
19
20
* 16:00 : Daily run meeting
21
* 16:30 : Close up Hall and prepare for running
22
* 17:00 : start of shift
23
* 23:30 : Stop data-taking, full shutdown of target, unlock and open hall
24
* 00:00 : end of shift
25
26
h2. Beamline Configurations
27
28
We expect to be running with 1-2 beamloss and beam bump active.
29
No DS.
30
31
h2. Data Requested
32
33
* Tracker calibration (standard procedure)
34
* Pion reference run
35
* TOF Calibration
36
37
h3. Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day) 
38
39
h3. Task 1 : Zero absorber data : 600k TOF2 triggers : (3,172) Pion Beam
40
41
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|
42
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
43
| pion| 232.5|228.41|225.44| 222.37| 78 | 49.14 | 89.82 | 54.95 | 171.69 | ----| 85.71 | 149.6 | 200.62 | 132.94 | 129.11 | 195.26 | 166.61 | 600k|
44
45
h3. Task 2 : Zero absorber data : 600k TOF2 triggers : (3, 200) Pion Beam
46
47
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|
48
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
49
| pion| 256|252.14|249.35| 246.46| 83 | 54.22 | 99.11 | 60.65 | 189.84 | ----| 94.4 | 165.67 | 222.17 | 147.28 | 146.06 | 220.98 | 188.68 | 600k |
50
51 3 Liu, Ao
h3. Task 3 (backup run plan): Ckov momentum scan for higher momentum pion beam
52
h4. Let's aim at 3000 pluses for each of the settings below. 
53
Please consult the beamline specialists on whether the current exceeds the limits. 
54
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|
55
| | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| |
56
| pion| 320 |316.48 |313.97|  | 29 | 68.0  | 124.3 | 76.1 | 241.7  | 0  | 117.8 | 209.0 | 280.3  | 185.9 | 190.3 | 288.1 | 246.2 | --- |
57
| pion| 340 |336.55 |334.09|  | 29 | 72.3  | 132.2 | 80.9 | 258.9  | 0  | 125.1 | 222.5 | 298.4  | 198.0 | 203.8 | 308.6 | 263.7 | --- |
58
| pion| 340 |356.60 |354.18|  | 29 | 76.6  | 140.1 | 85.7 | 276.7  | 0  | 132.4 | 236.0 | 316.4  | 210.0 | 217.3 | 329.0 | 281.2 | --- |
59
60 1 Boyd, Steven
h2. Phone details for 4pm daily run meeting
61
62
Phone access :  ReadyTalk number 
63
64
US 866-740-1260
65
66
UK 0800-496-0576
67
68
Swiss 0800-70-53-51
69
70
Italy 800182592
71
72
Access Code: 2155402