RunPlan20160228-0304 » History » Revision 2

« Previous | Revision 2/14 (diff) | Next »
Boyd, Steven, 18 February 2016 18:13


Daily Run plan : Feb 28 - Mar 3, 2016

Daily schedule

Days 25 Feb - 3 Mar
estimated time 17:00 - 00:00
MOM P. Kyberd
Lead shifter G. Vankova
Shifter 2 C. Hunt
BLOC
SOC
Experimenter J. Nugent
Aim Empty absorber data
Beam? Yes

Shift plan:

  • 16:00 : Daily run meeting
  • 16:30 : Close up Hall and prepare for running
  • 17:00 : start of shift
  • 23:30 : Stop data-taking, full shutdown of target, unlock and open hall
  • 00:00 : end of shift

Beamline Configurations

We expect to be running with 1-2 beamloss and beam bump active.
No DS.

Data Requested

  • Tracker calibration (standard procedure)
  • Pion reference run
  • TOF Calibration

Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day)

Task 1 : Zero absorber data : 600k TOF2 triggers : (3,172) Pion Beam

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
pion 232.5 228.41 225.44 222.37 78 49.14 89.82 54.95 171.69 ---- 85.71 149.6 200.62 132.94 129.11 195.26 166.61 600k

Task 2 : Zero absorber data : 600k TOF2 triggers : (3, 200) Pion Beam

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
pion 256 252.14 249.35 246.46 83 54.22 99.11 60.65 189.84 ---- 94.4 165.67 222.17 147.28 146.06 220.98 188.68 600k

Phone details for 4pm daily run meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Boyd, Steven over 7 years ago · 2 revisions