RunPlan20160228-0304 » History » Revision 13
Revision 12 (Hanlet, Pierrick, 01 March 2016 20:13) → Revision 13/14 (Hanlet, Pierrick, 01 March 2016 20:13)
h1. Daily Run plan : Feb 28 - Mar 3, 2016 h3. Daily schedule | Days | 25 Feb - 3 Mar | | | estimated time | | 17:00 - 00:00 | | MOM | P. Kyberd | | | Lead shifter | | G. Vankova | | Shifter 2 | | C. Hunt | | BLOC | | | | SOC | || | Experimenter | J. Nugent || | | || | Aim | Empty absorber data | | |Beam? | Yes || h2. Shift plan: * 16:00 : Daily run meeting * 16:30 : Close up Hall and prepare for running * 17:00 : start of shift * 23:30 : Stop data-taking, full shutdown of target, unlock and open hall * 00:00 : end of shift h2. Beamline Configurations We expect to be running with 1-2 beamloss and beam bump active. No DS. h2. Data Requested * Tracker calibration (standard procedure) * Pion reference run * TOF Calibration h3. Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day) h3. Task 1 : Zero absorber data : 600k TOF2 triggers : (3,172) Pion Beam | Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers| | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | | pion| 232.5|228.41|225.44| 222.37| 78 | 49.14 | 89.82 | 54.95 | 171.69 | ----| 85.71 | 149.6 | 200.62 | 132.94 | 129.11 | 195.26 | 166.61 | 600k| h3. Task 2 : Zero absorber data : 600k TOF2 triggers : (3, 200) Pion Beam | Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers| | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | | pion| 256|252.14|249.35| 246.46| 83 | 54.22 | 99.11 | 60.65 | 189.84 | ----| 94.4 | 165.67 | 222.17 | 147.28 | 146.06 | 220.98 | 188.68 | 600k | h3. Task 2a : Zero absorber data : 600k TOF2 triggers : (3, 200) Muon Beam with DS | Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag | | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | | muon| | | | | 83 | 97.7 | 122.0 | 84.9 | 305.0 | 637.9| 91.5 | 153.4 | 205.7 | 136.4 | 133.9 | 202.5 | 172.9 | 600k | 3-200+M0 | h3. Task 2b : Zero absorber data : 600k TOF2 triggers : (3, 240) Muon Beam with DS | Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag | | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | | muon|-- | --| --|-- | 83 | 113.7 | 142.1 | 98.9 | 370.5 | 743 | 104.4 | 176.2 | 236.3 | 156.7| 157.0 | 237.6 | 203.0 | 600k | 3-240+M0 | h3. Task 2c : Zero absorber data : 600k TOF2 triggers : (3, 172) Muon Beam with DS ("settings from this spreadsheet":http://micewww.pp.rl.ac.uk/attachments/5813/3_172_muon_beam.xls) | Particle Species| p at Tgt | pSol| pDiff| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers|Tag | | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | | pion/muon| 390 |221 | 179.4 | | 78 | 97.69 | 122.04 | 84.91 | 304.97 | 637.88 | 87.69 | 146.70 | 196.73 | 130.40| 126.96 | 192.07 | 163.96 | 600k | 3-172+M0 | 3-172 h3. Task 3 (backup run plan): Ckov momentum scan for higher momentum pion beam Similar runs: 7436-7441; 7456-7462 | Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Pulses | | | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| | | pion| 300 |296.40 |293.83| | 29 | 63.7 | 116.5 | 71.3 | 225.0 | 0 | 110.5 | 195.5 | 262.2 | 173.9 | 176.7 | 267.5 | 228.5 | 2000 | | pion| 320 |316.48 |313.97| | 29 | 68.0 | 124.3 | 76.1 | 241.7 | 0 | 117.8 | 209.0 | 280.3 | 185.9 | 190.3 | 288.1 | 246.2 | 3000 | | pion| 340 |336.55 |334.09| | 29 | 72.3 | 132.2 | 80.9 | 258.9 | 0 | 125.1 | 222.5 | 298.4 | 198.0 | 203.8 | 308.6 | 263.7 | 4000 | h2. Phone details for 4pm daily run meeting Phone access : ReadyTalk number US 866-740-1260 UK 0800-496-0576 Swiss 0800-70-53-51 Italy 800182592 Access Code: 2155402