Project

General

Profile

Actions

Daily Run plan : Feb 25-27, 2016

Daily schedule

Days 25-27 Feb
estimated time 9:00 - 17:00 17:00 - 00:00
MOM P. Kyberd
Lead shifter R. Gamet D. Orestano
Shifter 2 G. Vankova M. Bonesini
BLOC H. Nebrensky
SOC C. Rogers
Experimenter MOM
Aim Alignment data
Beam? Yes

Shift plan:

  • 9am: start of shift
  • 16:00pm : Daily run meeting
  • 10pm : end of shfit
    • Put target in standby
    • Hall kept locked

Beamline Configurations

We expect to be running with 1-2 beamloss and beam bump active.
No DS.

Data Requested

  • Tracker calibration (standard procedure)
  • Pion reference run
  • TOF Calibration

Task 0: Tracker calibration (start of each shift) and pion reference run (start of each day)

Task 1: Zero absorber data : 600k TOF2 triggers : 3pi-240-M0 muon beam without DS

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
pion 292 288.37 285.77 283.07 147 61.98 113.31 69.35 218.49 ---- 107.6 190.11 254.95 169.08 171.22 259.13 221.37 600k

Task 2 : Zero absorber data : 600k TOF2 triggers : (3,172) Pion Beam

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
pion 232.5 228.41 225.44 222.37 78 49.14 89.82 54.95 171.69 ---- 85.71 149.6 200.62 132.94 129.11 195.26 166.61 600k

Phone details for 4pm daily run meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Boyd, Steven over 7 years ago ยท 6 revisions