Summary of aims and timing of the run.
Daily schedule¶
Days | 17 Dec |
estimated time | 9 - 17 |
MOM | P. Franchini |
Lead shifter | F. Drielsma |
Shifter 2 | P. Hanlet |
BLOC | C. Heidt |
SOC | C. Rogers |
Experimenter | J. Nugent |
Aim | Scattering Data - No Field - No absorber |
Beam? | Yes |
Days | 17 Dec |
estimated time | 17 - 22 |
MOM | P. Franchini |
Lead shifter | D. Rajaram |
Shifter 2 | C. Heidt |
BLOC | C. Heidt |
SOC | C. Rogers |
Experimenter | J. Nugent |
Aim | Scattering Data - No Field - No absorber |
Beam? | Yes |
Shift plan:¶
- 9.30am: run meeting
- 10.00am: begin of the shift
- Shifters + BLOC arrive
- 10am: Flush the absorber: ~ 1 hour
- 11am: data taking
- 10pm: complete shutdown
Beamline Configurations¶
We expect to be running with 2V beamloss and beam bump active.
No DS.
No FCU.
No Xenon in the absorber.
Data Requested¶
- Data for multiple scattering in Xenon study
- Task1 has the higher priority
Task 0: Pion reference run¶
Task1: (3,240) Pion Beam¶
Particle Species | p at Tgt | p@D1 | p@D2 | p@Tof0 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | TOF2 Triggers |
MeV/c | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | ||
pion | 292 | 288.37 | 285.77 | 283.07 | 147 | 61.98 | 113.31 | 69.35 | 218.49 | ---- | 107.6 | 190.11 | 254.95 | 169.08 | 171.22 | 259.13 | 221.37 | 600k |
Phone details for 9am run meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Franchini, Paolo almost 8 years ago ยท 7 revisions