Summary of aims and timing of the run.

Daily schedule

Days 17 Dec
estimated time 9 - 17
MOM P. Franchini
Lead shifter F. Drielsma
Shifter 2 P. Hanlet
BLOC C. Heidt
SOC C. Rogers
Experimenter J. Nugent
Aim Scattering Data - No Field - No absorber
Beam? Yes
Days 17 Dec
estimated time 17 - 22
MOM P. Franchini
Lead shifter D. Rajaram
Shifter 2 C. Heidt
BLOC C. Heidt
SOC C. Rogers
Experimenter J. Nugent
Aim Scattering Data - No Field - No absorber
Beam? Yes

Shift plan:

  • 9.30am: run meeting
  • 10.00am: begin of the shift
    • Shifters + BLOC arrive
  • 10am: Flush the absorber: ~ 1 hour
  • 11am: data taking
  • 10pm: complete shutdown

Beamline Configurations

We expect to be running with 2V beamloss and beam bump active.
No DS.
No FCU.
No Xenon in the absorber.

Data Requested

  • Data for multiple scattering in Xenon study
  • Task1 has the higher priority

Task 0: Pion reference run

Task1: (3,240) Pion Beam

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 TOF2 Triggers
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
pion 292 288.37 285.77 283.07 147 61.98 113.31 69.35 218.49 ---- 107.6 190.11 254.95 169.08 171.22 259.13 221.37 600k

Phone details for 9am run meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402