Actions
December 7th, 2015 (Day Run)¶
Aim: FC to -100 A
Daily schedule¶
December | 7th |
Time | 10am - 4pm |
MOM | P. Franchini |
Lead shifter | R. Gardner |
Shifter 2 | J.B. Lagrange |
BLOC | C. Pidcott |
SOC | D. Rajaram |
Experimenter | S. Middleton/C. Rogers/J. Nugent |
Physics Shifter | S. Middleton/C. Rogers/J. Nugent |
Beam? | Yes |
Additional | FC expert (J. Cobb, V. Bayliss, S. Watson) + ISIS electrical support |
Shift plan:¶
- 8am: Ramp down FC from 100 A to 0 A
- 9am: run meeting
- 10am: begin of the shift
- Shifters + BLOC arrive
- Switch polarity of both the coils
- Ramp FC to -100 A ~100 mins
- Data taking at 0A ?????
- Data taking
- 4pm: open the hall
Data Requested¶
- Pion reference run
Beamline Configurations¶
- We expect to run with 2V beamloss and the beam bump active.
- DS is currently away
- Beam settings via Run Control
- Pion reference run
- Task2
- Task3
- Task4
Pions for FCU at -100 amps¶
Pion reference run¶
Task 1¶
dropped
Task 2¶
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) | Run Control Tag |
# | V | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | ||
10K @ TOF2 | 2 | pion | . | . | . | 53 | 49.86 | 91.12 | 55.75 | 174.22 | 0 | 86.93 | 151.86 | 203.65 | 134.96 | 131.51 | 198.9 | 169.74 | --- | ??? |
Task 3¶
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) | Run Control Tag |
# | V | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | ||
10K @ TOF2 | 2 | pion | . | . | . | 147 | 57.78 | 105.62 | 64.64 | 202.82 | 0 | 100.46 | 176.88 | 237.21 | 157.28 | 157.68 | 238.6 | 203.78 | --- | ??? |
Task 4¶
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) | Run Control Tag |
# | V | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | ||
10K @ TOF2 | 2 | pion | . | . | . | 147 | 70.15 | 128.27 | 78.51 | 250.24 | 0 | 121.46 | 215.76 | 289.35 | 191.94 | 197.08 | 298.34 | 254.95 | --- | ??? |
Phone details for 9am run meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Franchini, Paolo almost 8 years ago ยท 21 revisions