RunPlan20151007

October 07
estimated time 19:00 - 00:00 00:00 - 08:00
MOM Yordan Yordan
Lead Shifter Alex Alan
Shifter 1 Tanaz Tanaz
BLOC Victoria Victoria
SOC Durga Durga
Experimenter
Aim Data taking Data taking
Beam? Yes Yes
Additional Personnel

Configuration

  • SSU at design current

Run plan : Wednesday

We will start taking data around 7:30 am. By that time SSU will be ramping up, but not yet at full current.

Reference Run with Decay Solenoid / TOF1 trigger

Number of part. tr. Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) RunControl tag
# MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
10000 pion 272.42 268.67 265.98 243.4 29 67.9 84.9 59.0 203.0 443.1 104.8 176.8 237.1 157.2 157.6 238.5 203.7 4018 RefRun w/DS

Task 1 : Data for the CKOV momentum scan run

Number of pulses Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s)
# MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run # -
1000 pion 300 29 74.9 93.6 65.1 225.3 488.88 115.4 195.5 262.2 173.9 176.7 267.5 228.5

Continue with Ckov momentum scan with Decay Solenoid / TOF1 trigger

Number of part. tr. Particle Species p@Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) RunControl tag
# MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
3000 pion 240 29 59.7 74.6 51.9 177.6 389.9 92.3 154.7 207.5 137.5 134.6 203.5 173.7 4018 TestRun w/DS
1000 pion 260 29 64.8 80.9 56.3 193.2 422.4 100.0 168.4 225.8 149.7 148.9 225.3 192.4 4018 TestRun w/DS

Continue with Ckov momentum scan if time permits.

Number of part. tr. Particle Species p@Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) RunControl tag
# MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
1000 pion 300 268.7 266 29 57.8 105.6 64.6 202.8 488.88 100.4 176.8 237.1 157.2 157.6 238.5 203.7 5729

Assuming that by 10:00 am SSU has reached its design current.

Task 2 : 3pi 140 MeV Muon beam (1+2 hours).

Duration Particle Species p@Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Diffuser Setting Similar Run Run Control Tag
mm MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
1 hour 3pi 140 MeV Muon 408.6 334.94 194.86 44 80.33 100.34 69.80 243.06 524.18 73.88 122.40 164.15 108.73 101.18 152.95 130.42 --- 2300 3-140+M0

Send the accumulated date to C. Hunt for a feedback.

Duration Particle Species p@Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Diffuser Setting Similar Run Run Control Tag
mm MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
2 hour 3pi 140 MeV Muon 408.6 334.94 194.86 44 80.33 100.34 69.80 243.06 524.18 73.88 122.40 164.15 108.73 101.18 152.95 130.42 --- 2300 3-140+M0

Task 3 : 6pi 140 MeV Muon beam - Diffuser Setting #6 (1+2 hours).

Duration Particle Species p@Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Diffuser Setting Similar Run Run Control Tag
mm MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
1 hour 6pi 140 MeV Muon 327 324 189 0 81.92 102.33 71.18 248.44 534.62 75.47 125.19 167.89 111.22 104.22 157.56 134.37 #6 2526 6-140+M0

Send the accumulated date to C. Hunt for a feedback.

Duration Particle Species p@Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Diffuser Setting Similar Run Run Control Tag
mm MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
2 hour 6pi 140 MeV Muon 327 324 189 0 81.92 102.33 71.18 248.44 534.62 75.47 125.19 167.89 111.22 104.22 157.56 134.37 #6 2526 6-140+M0

Task 4 : 3pi 200 MeV Muon beam (2 hours).

Duration Particle Species p@Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Diffuser Setting Similar Run Run Control Tag
mm MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
2 hour 3pi 200 MeV Muon 390 386.65 230.97 0 97.69 122.04 84.91 304.97 637.88 91.5 153.41 205.72 136.38 133.87 202.54 172.94 -- 2267 3-200+M0

Updated by Dick, Alexander Dick almost 8 years ago ยท 26 revisions