1 1 Boyd, Steven
h1. RunPlan20151001
2
3 8 Karadzhov, Yordan
| October  | 2-3  |  |
4
| estimated time | 19:00 - 00:00 | 00:00 - 08:00 | 
5
| MOM       | Y. Karadzhov | Y. Karadzhov | 
6
| Lead Shifter | Francois  |    Jaroslaw   |    
7
| Shifter 1 | Paolo |  Alex  |  
8
| BLOC      | Celeste (weekend) |  |  
9
| SOC       | Chris H ||    
10
| Experimenter |  |  |
11
|  | | |
12
| Aim       | Data taking | Data taking |
13
|           |     |  |  
14
| Beam?  | Yes | Yes |   
15
| Additional Personnel   |   | |   
16
|           |     |  |
17
18
| October  | 3-4  |  |   |
19 1 Boyd, Steven
| estimated time | 08:00 - 16:00 | 16:00 - 00:00 | 00:00 - 08:00 | 
20
| MOM       | Y. Karadzhov | Y. Karadzhov | Y. Karadzhov  | 
21
| Lead Shifter | Alex | Alan   |    Jaroslaw   |    
22 5 Boyd, Steven
| Shifter 1 | Tanaz |  Ao  |  Durga |     
23
| BLOC      | Celeste (weekend) | | |  
24 1 Boyd, Steven
| SOC       | Chris H ||     |   
25
| Experimenter |  |  |  |
26
|  | | | |
27
| Aim       | Data taking | Data taking | Data taking |
28
|           |     |  |   |
29
| Beam?  | Yes | Yes | |  
30
| Additional Personnel |  |   | |   
31 2 Boyd, Steven
|           |     |  ||
32
33
h2. Configuration
34
35
* SSU at design current
36 1 Boyd, Steven
* the DS PSU will be run in local mode, and at fixed current, until a ramp-circuit fault has been identified & fixed.
37 2 Boyd, Steven
It is imperative that the DS PSU is operated only by designated DS experts with appropriate 
38 9 Karadzhov, Yordan
experience - ie Mark Tucker, Vicky Bayliss, and myself. The current is currently set to *524.2A*
39 2 Boyd, Steven
40
h2. Known Issues
41
42
43
h2. New Shift Checklist
44
45 6 Boyd, Steven
The shift checklist can be found in the eLog.
46 2 Boyd, Steven
Please go through the checklist at least *every two hours.*
47
48
h2. Hall probe monitoring and operation
49
50
Melissa would like shifters to take data with the hall probes once per shift. The operating instructions can be found "here":http://micewww.pp.rl.ac.uk/projects/operations/wiki/Shifter_Rules_and_Checklists
51 7 Blackmore, Victoria
52
*Additional request:*  If magnet team agree, pause the ramp *up* at Solenoid Mode currents and take a Hall probe reading.  Then continue ramp up to Flip Mode currents.  When magnet team decide to ramp back down to Solenoid Mode currents, take another Hall probe reading.  (This will let us see how affected we are by hysteresis & the PRY when ramping up to a current from below, and down to a current from above.  Best practice is always ramping *up* to your desired current and not down as will be done at the end of this shift.)
53 10 Karadzhov, Yordan
54
h1. Weekend run plan : Friday - Saturday - Sunday
55
56 11 Karadzhov, Yordan
h2. Task 1 : ?????? (Measurement Co-ordinator : Jaroslaw & Victoria)
57 1 Boyd, Steven
58 11 Karadzhov, Yordan
h3.  3pi 140 MeV Muon beam.
59
60 10 Karadzhov, Yordan
|  Particle Species | p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Diffuser Setting | Similar Run(s)| # triggers |  Run Control Tag | 
61
| mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #| | |
62
| 3pi 140 MeV Muon | ? | ? | ? | 44 | 80.33 | 100.34 | 69.80 | 243.06 | fixed | 73.88 | 122.40 | 164.15 | 108.73 | 101.18 |152.95 | 130.42 | --- | 2300 | 70k @ TOF2 | 3-140+M0 |
63
64 1 Boyd, Steven
65 12 Karadzhov, Yordan
h3.  6pi 140 MeV Muon beam.
66
67
|  Particle Species | p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Diffuser Setting | Similar Run(s)| # triggers |  Run Control Tag | 
68
| mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #| | |
69 13 Karadzhov, Yordan
| 6pi 140 MeV Muon | ? | ? | ? | 44 | 81.92 | 102.33 | 71.18 | 248.44 | fixed | 75.47 | 125.19 | 167.89 | 111.22 | 104.22 | 157.56 | 134.37 | --- | 2300 | 70k @ TOF2 | 3-140+M0 |
70 12 Karadzhov, Yordan
71
72 11 Karadzhov, Yordan
h3. 6pi 200 MeV Muon beam.
73 10 Karadzhov, Yordan
|  Particle Species | p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Diffuser Setting | Similar Run(s)| # triggers |  Run Control Tag | 
74
| mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #| | |
75
| 6pi 200 MeV Muon | ? | ? | ? | 82 | 102.4 | 127.9 | 88.9 | 323.2 |fixed| 94.2 | 158.2 | 212.0 | 140.6 | 138.7 | 209.8 | 179.2 | 7 | 7159 | 70k @ TOF2 | 6-200+M0 |