1 1 Overton, Edward
h1. RunPlan20150722
2
3 5 Boyd, Steven
| July  | 21 |  |   |
4
| estimated time | 06:00-14:00 | 14:00-22:00 | 22:00-06:00 |
5 6 Boyd, Steven
| MOM       | P. Hodgson | P. Hodgson  |  P. Hodgson |
6 5 Boyd, Steven
| Lead Shifter | Jan | Celeste | Paolo |
7
| Shifter 1 | Tanaz | Pavel | Dejan |
8
| BLOC      | Celeste | Celeste  | Joe  |
9
| SOC       |  |  |  |
10
| Experimenter |  |  | |
11
|  | | | 
12
| Aim       | On Call | On Call | On Call / Half-field run / TOF Calibration |  
13
|           |     |  |   |
14
| Beam?  | Yes(?) | Yes(?) | Yes(?) | 
15
| Additional Personnel |  |  |  |   
16
|           |     |  | |  
17
18
h2. Shift plans
19
20
h3. Half Field Run
21
22
If a stable magnetic field is generated expect to take data
23
* DS is required
24
* Propose to take data using a 6-140+M0 beam.
25
** Check rate at setup time
26 7 Boyd, Steven
** TOF2 trigger rate should be > 5 per spill
27 5 Boyd, Steven
* Reference run is a potential fall back position if the rate is too low.
28
29
30
h3. TOF Calibration
31
32
If there are not Tracker timing instructions by run time and no field take TOF calibration data for the duration of the midnight shift instead.
33
34
| Number of pulses| Beamloss |  Particle Species| p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
35
| #  | V  | mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|
36
| 25000 min | 1 | Positron | 300.0 | 259.7 | 249.58 | 29  | 56.35 | 102.7 | 62.65 | 195.72| ---| 98.59| 163.16 |218.79 | 114.14| 83.40| 125.70 | 80.06| 1678 |
37
38
39
h2. What We Haven't Done
40
41
# Tracker Timing Studies
42
** Ed Overton used available time for Tracker calibration.
43
** Has produced a script to step through the required settings (see end of this run plan)
44
45
46
h2. Run Time Preparedness.
47
48
* Downstream PID Detectors (EMR/KL/TOF) 
49
** to be moved to final positions (July 16)
50
** HV to be turned on and DAQ reconfigured (July 16?)
51
** Detectors reconnected (July 15)
52
* Upstream PID Detectors (Ckov/TOFs)
53
** in final positions -- Done (July 4)
54
* Trackers
55
** Helium on
56
*** downstream tracker -- Done but not maintained. (July 17)
57
*** Upstream tracker still has a leak -- to be fixed in August
58
** Repair dead channels.
59
* Run Control
60
** CDB interface
61
*** Need to improve stability of run control - remove need for IOC restart
62
** CDB beam line control
63
*** Starting beam line current from zero doesn't work due to polarimeter -- Fixed (July 12)
64
* Beam line control
65
** "Set all to 0" button has not operated in a predictable manner -- Corrected. (July 12)
66
* Beam line
67
** Decay Solenoid filled and ramped (July 22)
68
** Correcting limits on the alarm handler.
69
*** Likely to wait for September run.
70
71
h2. Notes
72
73
* Reminder: The end of run comment must be filled for the run to register as completed on CDB. Ensure that the enter key is struck while in the end comment dialogue box at the end of every run.
74
75
h3. Temporary Run Control Instructions
76
77
* Restart Run Control after *every run*
78
* Currently using *pro* branch in MLCR.
79
* If Run Control was no restarted and it crashes the terminal, type "reset" (no quotes) to regain control, then restart Run Control. *Do not* log in/out
80
* If there is doubt contact Pierrick Hanlet or Chris Heidt
81
82
83
84
h2. Phone details for 6pm daily meeting
85
86
Phone access :  ReadyTalk number 
87
88
US 866-740-1260
89
90
UK 0800-496-0576
91
92
Swiss 0800-70-53-51
93
94
Italy 800182592
95
96
Access Code: 2155402
97
98 1 Overton, Edward
h3. Tracker Timing studies
99
100 2 Overton, Edward
101 3 Overton, Edward
Please use the following standard pion reference beam (and check this is the std. reference beam):
102 2 Overton, Edward
103
|  Particle Species | p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
104
| mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|
105 1 Overton, Edward
| Pion Reference | ? | ? | ? | 29  | 57.8 | 105.7 | 64.5 | 202.8| ---| 176.9 | 237.1 | 157.2 | 157.6 | 238.5 | 125.70 | 203.7 | 7257 |
106 3 Overton, Edward
107
I would  like the following runs:
108
Target is 25K Triggers in TOF1 per run...
109
110
| Run Type | Timing FileName | Efficiency   | Alive Window | Alive Window | Est.   | Run # |
111
|          |          | (Trig/Request) | Delay (ns)   | Width (ns)   | Spills |       |
112 4 Overton, Edward
| Nominal  | Nominal.cfg         | 0.8        | 130          | 110 (116.4 meas.) | 1400 (20min)| ?? |
113
| Section1 | Timing_section1.cfg | <0.2       | 130          | 30 (35 meas.) | 5600  (2hr) | ?? |
114
| Section2 | Timing_section2.cfg | >0.2       | 130          | 30 (30 meas.) | 5600 (2hr) | ?? |
115
| Section3 | Timing_section3.cfg | >0.2       | 130          | 30 (35 meas.) | 5600 (2hr) | ?? |
116
| Section4 | Timing_section4.cfg | <0.2       | 130          | 30 (35 meas.) | 5600 (2hr) | ?? |
117 1 Overton, Edward
118 4 Overton, Edward
*Instructions:*
119
120
Cd into directory on acq machine:
121
<pre>
122
ssh miceacq16
123
cd ~/tracker/gate_generator_config/
124
</pre>
125
126
For each setting do the following Run:
127
<pre>
128
./ConfigDownloadT560.py timing_studies/FileName
129
</pre>eg:
130
<pre>
131
./ConfigDownloadT560.py timing_studies/Timing_section1.cfg
132
</pre>
133
134
Once complete run to restore to normal beam settings:
135
<pre>
136
./ConfigDownloadT560.py BeamTiming_TOF1.cfg
137
</pre>
138
139 3 Overton, Edward
Notes: In run 7257 830 spills collected. Assume ~1 noise hit in TOF2/TOF1 per spill = 830 noise hits
140 1 Overton, Edward
TOF2/TOF1 scalars: 4835/19737 = 25%
141 3 Overton, Edward
TOF2(-noise)/TOF1(-noise) = 20%
142
23 Triggers per spill.
143
144
Would like ~5K hits in TOF2 for each setting. => 25K Particle Triggers in TOF1.
145 4 Overton, Edward
Could Halve these values if needed...