Project

General

Profile

RunPlan20150722 » History » Version 10

Franchini, Paolo, 22 July 2015 23:54

1 1 Overton, Edward
h1. RunPlan20150722
2
3 5 Boyd, Steven
| July  | 21 |  |   |
4
| estimated time | 06:00-14:00 | 14:00-22:00 | 22:00-06:00 |
5 6 Boyd, Steven
| MOM       | P. Hodgson | P. Hodgson  |  P. Hodgson |
6 5 Boyd, Steven
| Lead Shifter | Jan | Celeste | Paolo |
7
| Shifter 1 | Tanaz | Pavel | Dejan |
8
| BLOC      | Celeste | Celeste  | Joe  |
9
| SOC       |  |  |  |
10
| Experimenter |  |  | |
11
|  | | | 
12
| Aim       | On Call | On Call | On Call / Half-field run / TOF Calibration |  
13
|           |     |  |   |
14
| Beam?  | Yes(?) | Yes(?) | Yes(?) | 
15
| Additional Personnel |  |  |  |   
16
|           |     |  | |  
17
18
h2. Shift plans
19
20
h3. Half Field Run
21
22
If a stable magnetic field is generated expect to take data
23
* DS is required
24
* Propose to take data using a 6-140+M0 beam.
25
** Check rate at setup time
26 9 Boyd, Steven
** TOF1 trigger
27 7 Boyd, Steven
** TOF2 trigger rate should be > 5 per spill
28 10 Franchini, Paolo
** 300k TOF1 triggers
29 5 Boyd, Steven
* Reference run is a potential fall back position if the rate is too low.
30
31
32
h3. TOF Calibration
33
34
If there are not Tracker timing instructions by run time and no field take TOF calibration data for the duration of the midnight shift instead.
35
36
| Number of pulses| Beamloss |  Particle Species| p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
37
| #  | V  | mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|
38
| 25000 min | 1 | Positron | 300.0 | 259.7 | 249.58 | 29  | 56.35 | 102.7 | 62.65 | 195.72| ---| 98.59| 163.16 |218.79 | 114.14| 83.40| 125.70 | 80.06| 1678 |
39
40
41
h2. What We Haven't Done
42
43
# Tracker Timing Studies
44
** Ed Overton used available time for Tracker calibration.
45
** Has produced a script to step through the required settings (see end of this run plan)
46
47
48
h2. Run Time Preparedness.
49
50
* Downstream PID Detectors (EMR/KL/TOF) 
51
** to be moved to final positions (July 16)
52
** HV to be turned on and DAQ reconfigured (July 16?)
53
** Detectors reconnected (July 15)
54
* Upstream PID Detectors (Ckov/TOFs)
55
** in final positions -- Done (July 4)
56
* Trackers
57
** Helium on
58
*** downstream tracker -- Done but not maintained. (July 17)
59
*** Upstream tracker still has a leak -- to be fixed in August
60
** Repair dead channels.
61
* Run Control
62
** CDB interface
63
*** Need to improve stability of run control - remove need for IOC restart
64
** CDB beam line control
65
*** Starting beam line current from zero doesn't work due to polarimeter -- Fixed (July 12)
66
* Beam line control
67
** "Set all to 0" button has not operated in a predictable manner -- Corrected. (July 12)
68
* Beam line
69
** Decay Solenoid filled and ramped (July 22)
70
** Correcting limits on the alarm handler.
71
*** Likely to wait for September run.
72
73
h2. Notes
74
75
* Reminder: The end of run comment must be filled for the run to register as completed on CDB. Ensure that the enter key is struck while in the end comment dialogue box at the end of every run.
76
77
h3. Temporary Run Control Instructions
78
79
* Restart Run Control after *every run*
80
* Currently using *pro* branch in MLCR.
81
* If Run Control was no restarted and it crashes the terminal, type "reset" (no quotes) to regain control, then restart Run Control. *Do not* log in/out
82
* If there is doubt contact Pierrick Hanlet or Chris Heidt
83
84
85
86
h2. Phone details for 6pm daily meeting
87
88
Phone access :  ReadyTalk number 
89
90
US 866-740-1260
91
92
UK 0800-496-0576
93
94
Swiss 0800-70-53-51
95
96
Italy 800182592
97
98
Access Code: 2155402
99
100 1 Overton, Edward
h3. Tracker Timing studies
101
102 2 Overton, Edward
103 3 Overton, Edward
Please use the following standard pion reference beam (and check this is the std. reference beam):
104 2 Overton, Edward
105
|  Particle Species | p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
106
| mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|
107 1 Overton, Edward
| Pion Reference | ? | ? | ? | 29  | 57.8 | 105.7 | 64.5 | 202.8| ---| 176.9 | 237.1 | 157.2 | 157.6 | 238.5 | 125.70 | 203.7 | 7257 |
108 3 Overton, Edward
109
I would  like the following runs:
110
Target is 25K Triggers in TOF1 per run...
111
112
| Run Type | Timing FileName | Efficiency   | Alive Window | Alive Window | Est.   | Run # |
113
|          |          | (Trig/Request) | Delay (ns)   | Width (ns)   | Spills |       |
114 4 Overton, Edward
| Nominal  | Nominal.cfg         | 0.8        | 130          | 110 (116.4 meas.) | 1400 (20min)| ?? |
115
| Section1 | Timing_section1.cfg | <0.2       | 130          | 30 (35 meas.) | 5600  (2hr) | ?? |
116
| Section2 | Timing_section2.cfg | >0.2       | 130          | 30 (30 meas.) | 5600 (2hr) | ?? |
117
| Section3 | Timing_section3.cfg | >0.2       | 130          | 30 (35 meas.) | 5600 (2hr) | ?? |
118
| Section4 | Timing_section4.cfg | <0.2       | 130          | 30 (35 meas.) | 5600 (2hr) | ?? |
119 1 Overton, Edward
120 4 Overton, Edward
*Instructions:*
121
122
Cd into directory on acq machine:
123
<pre>
124
ssh miceacq16
125
cd ~/tracker/gate_generator_config/
126
</pre>
127
128
For each setting do the following Run:
129
<pre>
130
./ConfigDownloadT560.py timing_studies/FileName
131
</pre>eg:
132
<pre>
133
./ConfigDownloadT560.py timing_studies/Timing_section1.cfg
134
</pre>
135
136
Once complete run to restore to normal beam settings:
137
<pre>
138
./ConfigDownloadT560.py BeamTiming_TOF1.cfg
139
</pre>
140
141 3 Overton, Edward
Notes: In run 7257 830 spills collected. Assume ~1 noise hit in TOF2/TOF1 per spill = 830 noise hits
142 1 Overton, Edward
TOF2/TOF1 scalars: 4835/19737 = 25%
143 3 Overton, Edward
TOF2(-noise)/TOF1(-noise) = 20%
144
23 Triggers per spill.
145
146
Would like ~5K hits in TOF2 for each setting. => 25K Particle Triggers in TOF1.
147 4 Overton, Edward
Could Halve these values if needed...