estimated time 9:30-15:00 15:00-20:00 20:00-00:00
MOM R. Bayes R. Bayes R. Bayes
Lead Shifter Jan Celeste Paolo
Shifter 1 Tanaz Pavel Dejan
BLOC Celeste Celeste Joe
SOC
Experimenter
Aim Magnet Commissioning Magnet Commissioning None
Beam? No No No
Additional Personnel

Shift plans

Magnet Commissioning

  • To be conducted for the majority of the day.
  • Shifters will provide support for these activities in the form of
    • monitoring solenoid state
    • controlled entry procedures
    • other activities as requested

Half Field Beam line Test Results

Last night's test of the proposed beam for the half field run is given below

Number of pulses Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) RunControl Tag
# A A A A A A A A A A A A A A A A DAQ run #
2000 min Pion 178.25 173.18 169.42 29 37.35 68.20 41.69 130.66 --- 65.16 111.76 149.88 99.13 85.33 128.71 109.33 Pion100_NoDS
  • Run did not write to configuration data base at the end of run.
    • The following results were recovered from the status GUI
Number of Spills 2008
TOF0 Triggers 72091
TOF1 Triggers 13390
TOF2 Triggers 7249
ISIS S7-3 Eloss 0.85 V
ISIS S7-4 Eloss 0.59 V
ISIS S8-1 Eloss 0.98 V
ISIS total Eloss 2.42 V

What We Haven't Done

  1. TOF Calibration
    • Have not had a block of time sufficient to accrete necessary data
  2. Tracker Timing Studies
    • Ed Overton used available time for Tracker calibration.
    • Has suggested producing a script to step through proposed settings for shifters to operate

Run Time Preparedness.

  • Downstream PID Detectors (EMR/KL/TOF)
    • to be moved to final positions (July 16)
    • HV to be turned on and DAQ reconfigured (July 16?)
    • Detectors reconnected (July 15)
  • Upstream PID Detectors (Ckov/TOFs)
    • in final positions -- Done (July 4)
  • Trackers
    • Helium on
      • downstream tracker -- Done but not maintained. (July 17)
      • Upstream tracker still has a leak -- to be fixed in August
    • Repair dead channels.
  • Run Control
    • CDB interface
      • Need to improve stability of run control - remove need for IOC restart
    • CDB beam line control
      • Starting beam line current from zero doesn't work due to polarimeter -- Fixed (July 12)
  • Beam line control
    • "Set all to 0" button has not operated in a predictable manner -- Corrected. (July 12)
  • Beam line
    • Decay Solenoid now filled (July 18)
      • Ready for ramping
    • Correcting limits on the alarm handler.
      • Likely to wait for September run.

Expected Work in the Hall

  • Tracker commissioning and repairs to be conducted
    • Will involve Paul R., Alan B. and Ed O.
    • Expect them to be moving in and out of the hall

Notes

  • Reminder: The end of run comment must be filled for the run to register as completed on CDB. Ensure that the enter key is struck while in the end comment dialogue box at the end of every run.

Temporary Run Control Instructions

  • Restart Run Control after every run
  • Currently using pro branch in MLCR.
  • If Run Control was no restarted and it crashes the terminal, type "reset" (no quotes) to regain control, then restart Run Control. Do not log in/out
  • If there is doubt contact Pierrick Hanlet or Chris Heidt

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Bayes, Ryan over 8 years ago ยท 2 revisions