RunPlan20150716¶
Preparation for running
Daily schedule¶
July | 16 | |
estimated time | 9:30-15:00 | 15:00-20:00 |
MOM | R. Bayes | R. Bayes |
Lead shifter | Francois | Paolo |
Shifter 2 | Vittorrio | Galena |
Shifter 3 | Tanaz | Roumen |
BLOC | Henry | Henry |
SOC | ||
Experimenter | ||
Aim | Tracker Commissioning | Tracker Commissioning |
Beam? | No? | Yes? |
Additional Personnel | Paul R. | |
Beamline Configurations¶
We expect to be running with 2V beamloss and beam bump active.
Shift Activities¶
- Repairs on the tracker system and magnet commissioning are priority.
- Expect engineer to arrive to commission the ODH system.
- Data collection suspended.
Run Time Preparedness.¶
- Downstream PID Detectors (EMR/KL/TOF)
- to be moved to final positions
- HV to be turned on and DAQ reconfigured
- Detectors reconnected (July 15)
- Upstream PID Detectors (Ckov/TOFs)
- in final positions -- Done (July 4)
- Trackers
- Helium on
- downstream tracker -- Done (July 3)
- Upstream tracker still has a leak -- to be done in August
- Repair dead channels.
- Helium on
- Run Control
- CDB interface
- Need to improve stability of run control - remove need for IOC restart
- CDB beam line control
- Starting beam line current from zero doesn't work due to polarimeter -- Fixed (July 12)
- CDB interface
- Beam line control
- "Set all to 0" button has not operated in a predictable manner -- Corrected. (July 12)
- Beam line
- Decay Solenoid on standby -- Done (July 13)
- Correcting limits on the alarm handler.
Expected Work in the Hall¶
- Tracker commissioning and repairs to be conducted
- Will involve Paul R., Alan B. and (later) Ed O.
- Expect them to be moving in and out of the hall
- ODH inspection
- Expect engineering company to have access to the hall for a span of time to commission the system
- Pipe welding
- Work between 20:00 and 22:00.
- Would like to minimize additional personnel during this time.
Phone details for 6pm daily meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Bayes, Ryan over 8 years ago ยท 5 revisions