Project

General

Profile

Actions

Run Planning Discussion 1 July, 2015

Magnet training.

Daily schedule

July 1
estimated time 10pm - 6am
MOM R. Bayes
Lead shifter A. Liu
Shifter 2 Mariyan Bogomilov
BLOC C. Heidt
SOC F. Drielsma
Experimenter
Physics Shifter C. Hunt
Aim Magnet cooling
Beam? Yes
Additional Personnel

Hall Status

  • The priority is placed on the magnet cooling activities.
  • Our search and seal procedures represent an impediment to free access of the hall so data collection is suspended until either the case is made for more data prior to 4 July or the beginning of user run 01b.
  • Cooling SSD is "complete". Cooling of SSU continues.
  • It will take 1 day to make preparations for the resumption of data collection so any case for data must be made before Friday.

Shifter Status

  • Daniel Bowring is to be placed on reserve shifter status and Mariyan Bogomilov is now the active Shifter 2 so that Daniel may help with the cooling during the day.

Analysis Status

Tracker Alignment/Calibration

Beam line Optimization

  • There is evidence that the following run produces an increased number of TOF triggers.
Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 RunControl tag
MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
Pi+/Mu+ 408.6 405.27 238.0 82 102.4 127.9 89.0 323.2 668.6 94.2 181.07 211.53 98.54 136.50 210.49 177.76 6-200+MatchDown3_With_DS
  • There is a request to retake these data next time beam is available.
  • Can the normalization be done with the existing data?
  • Still needs a strong case by tracker group for the resumption of data collection.

Notes

Standing Run Control Instruction

  • Reminder: The end of run comment must be filled for the run to register as completed on CDB. Ensure that the enter key is struck while in the end comment dialogue box at the end of every run.

Temporary Run Control Instructions

  • Restart Run Control after every run
  • Currently using development branch in MLCR.
  • If Run Control was no restarted and it crashes the terminal, type "reset" (no quotes) to regain control, then restart Run Control. Do not log in/out
  • Run data mover after every run
  • If there is doubt contact Pierrick Hanlet or Chris Heidt

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Bayes, Ryan over 8 years ago ยท 1 revisions