Run Plan 26 June, 2015

Tracker alignment with a muon beam, field off.

Daily schedule

June 26
estimated time 10pm - 6am
MOM R. Bayes
Lead shifter C. Pidcott
Shifter 2 A. Dick
BLOC C.Pidcott
SOC J. Nugent
Experimenter
Physics Shifter P. Franchini
Aim muon beam alignment data
Beam? Yes
Additional Personnel

Data Requested

  • Reference Run
  • 300 MeV muon beam based alignment data for remaining time. (Currents provided)

Beamline Configurations

We expect to be running with 2V beamloss and beam bump active.

Reference Run with Decay Solenoid

Please use the run control settings.

Data for Alignment study:

Requested: 300 MeV muon beam with 70k TOF2 events. No specific emittance but Ed suggests that the diffuser will reduce the rate too much to be useful. As there are no settings in run control, the following have been taken from the magic spreadsheet.

Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 RunControl tag
MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
Mu+ 342 338 336 82 85.6 106.9 74.9 261.1 558.8 131.5 244.1 300.6 199.4 204.7 309.9 264.9 NA
  • proton absorber setting is unknown but can be taken from the 6-240 MeV+M0 beam in run control.
  • ~10000 spills
  • If the target number of spills is achieved then go to 6-200+M0 beam and take 70k TOF2 events or 10000 spills ( which ever comes first),

Redo beam line study.

  • If that is achieved redo the run for Jaroslaw's beam study (which was wiped out by data corruption)
Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 RunControl tag
MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
Pi+/Mu+ 408.6 405.27 238.0 82 102.4 127.9 89.0 323.2 668.6 94.2 181.07 211.53 98.54 136.50 210.49 177.76 6-200+MatchDown3_With_DS
  • take ~5000 pulses of the above.

Alignment data with diffuse beam.

  • If that is complete return to 6-200+M0 beam with all irises closed except for iris4 (mask 1110). This should be the diffuser with the thick tungsten iris excluded.

Notes

  • The 315 A restriction is only for downstream quadrupoles. D1 should be fine at the current given above.
  • The solenoid cooling is ongoing. This seemed to work well in parallel with the data collection of the evening of the 25 June. Should this continue it will mean there will be occasional (every 4 hours) controlled access of the hall to change the nitrogen dewars.

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402