Run Plan 25 June, 2015

Tracker alignment with a muon beam, field off.

Daily schedule

June 25
estimated time 10pm - 6am
MOM R. Bayes
Lead shifter C. Pidcott
Shifter 2 A. Dick
BLOC C.Pidcott
SOC J. Nugent
Experimenter
Physics Shifter P.Franchini
Aim muon beam alignment data
Beam? Yes
Additional Personnel

Data Requested

  • Reference Run
  • 5000 pulses of 6,200 M0 beam (as in run control)
  • 5000 pulses of altered 6,200 beam with re-optimized quadrupole currents (see below).
  • 240 MeV muon beam based alignment data for remaining time.

Beamline Configurations

We expect to be running with 2V beamloss and beam bump active.

Reference Run without Decay Solenoid

Particle Species p at Tgt p@D1 p@D2 p@Tof0 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Ran? Similar Run(s)
MeV/c MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
pion 272.42 268.67 265.98 143.4 29 57.8 105.6 64.6 202.8 ---- 100.4 176.8 237.1 157.2 157.6 238.5 203.7

Data for Study 2:

6,200+M0 settings from run control
This setting based on (6, 200), WITH DS and with different settings in Q4-Q7 aiming for higher intensity in downstream detectors

Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 RunControl tag
MeV/c MeV/c MeV/c mm A A A A A A A A A A A A
Pi+/Mu+ 408.6 405.27 238.0 82 102.4 127.9 89.0 323.2 668.6 94.2 181.07 211.53 98.54 136.50 210.49 177.76 6-200+MatchDown3_With_DS

Data for Study 3:

3,240+M0 settings from run control

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Bayes, Ryan over 8 years ago ยท 6 revisions