Run Plan 25 June, 2015¶
Tracker alignment with a muon beam, field off.
Daily schedule¶
June | 25 |
estimated time | 10pm - 6am |
MOM | R. Bayes |
Lead shifter | C. Pidcott |
Shifter 2 | A. Dick |
BLOC | C.Pidcott |
SOC | J. Nugent |
Experimenter | |
Physics Shifter | P.Franchini |
Aim | muon beam alignment data |
Beam? | Yes |
Additional Personnel |
Data Requested¶
- Reference Run
- 5000 pulses of 6,200 M0 beam (as in run control)
- 5000 pulses of altered 6,200 beam with re-optimized quadrupole currents (see below).
- 240 MeV muon beam based alignment data for remaining time.
Beamline Configurations¶
We expect to be running with 2V beamloss and beam bump active.
Reference Run without Decay Solenoid¶
Particle Species | p at Tgt | p@D1 | p@D2 | p@Tof0 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Ran? | Similar Run(s) |
MeV/c | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | ||
pion | 272.42 | 268.67 | 265.98 | 143.4 | 29 | 57.8 | 105.6 | 64.6 | 202.8 | ---- | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 |
Data for Study 2:¶
6,200+M0 settings from run control
This setting based on (6, 200), WITH DS and with different settings in Q4-Q7 aiming for higher intensity in downstream detectors
Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | RunControl tag |
MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | ||
Pi+/Mu+ | 408.6 | 405.27 | 238.0 | 82 | 102.4 | 127.9 | 89.0 | 323.2 | 668.6 | 94.2 | 181.07 | 211.53 | 98.54 | 136.50 | 210.49 | 177.76 | 6-200+MatchDown3_With_DS |
Data for Study 3:¶
3,240+M0 settings from run control
Phone details for 6pm daily meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Bayes, Ryan over 8 years ago ยท 6 revisions